SCH Number 2000044006
Project Info
- Title
- GKM Facility, Infrastructure Improvements, and Whitcomb Avenue Street Extension
- Description
- Project is associated with "GKM Corporation Facility Infrastructure Improvements and Whitcomb Avenue Street Extention". Applicant, Peter Brodeur representing J.P. & Associates, Inc., will contruct a storm water detention pond in the existing drainage channel. The pond will be designed to hold a 40 year storm at on hour. A 100' long 48" or longer culvert will be placed at the outflow of the pond.
2 documents in project