SCH Number 2000021032


Project Info

Title
EA LHO 1-00; (a) Lot Line Adjustment 137-99, (b) Zone Variance, Map 99
Description
(a) A Lot Line Adjustment between two parcels to create a parcel of 302.32 acres for agricultural use as a Tomato Processing Facility and a parcel of 3.61 acres for a related electrical substation served by Pacific Gas and Electric Company (PG&E) transmission lines; a Limited Design Variation to allow non-radial and non-right angle lot lines. (b) A Zone Variance to allow a 3.61 acre parcel where the minimum parcel size is 20 acres in the A (Exclusive Agricultural) District. Tomato Processing facility is a permitted use as an agricultural industry. It is subject to development standards and a plot plan review under the Kern County Zoning Oridinance. The construction and operation of the Tomato Processing facility, includes a related office building, 160 parking spaces with 6 handicapped spaces for Phase I caretaker mobile home, truck staging area, scale house, bin and drum storage area, railroad loading dock, and drainage sumps on 55 acres; Access is from State Highway 58 (McKittrick Highway), across the Buttonwillow Branch of the Union Pacific Railroad (operated by San Joaquin Valley Railroad) along an existing unimproved farm road.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Kern County EA LHO 1-00; (a) Lot Line Adjustment 137-99, (b) Zone Variance, Map 99
Kern County EA LHO 1-00; (a) Lot Line Adjustment 137-99, (b) Zone Variance, Map 99