SCH Number 1990011102


Project Info

Title
SDCWA PIPELINE 4-B, PHASE II
Description
THE SDCWA WATER DISTRIBUTION PLAN (WDP) IS A CAPITAL IMPROVEMENT PROGRAM TO INCREASE THE CAPACITY, RELIABILITY, OPERATIONAL FLEXIBILITY AND YEILD OF THE EXISTING AQUEDUCT SYSTEM. THE PROPOSED IMPROVEMENTS TO THE SECOND SAN DIEGO AQUADUCT, WHICH ARE PART OF THE WDP, ARE SHOWN IN FIGURE 2. PIPELINE 4B, PHASE II (4B11) WILL BE A 96 INCH DIAMETER TREATED WATER PIPELINE. THIS 2 1/2 MILE SECTION WILL CONNECT PIPELINE 4B, PHASE I, AT THE NORTH END TO PIPELINE 4 EXTENTION, PHASE I, AT THE SOUTH END.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
San Diego County Water Authority SDCWA PIPELINE 4-B, PHASE II
San Diego County Water Authority SDCWA PIPELINE 4-B, PHASE II