SDCWA PIPELINE 4-B, PHASE II
2 Documents in Project
Summary
SCH Number
1990011102
Lead Agency
San Diego County Water Authority
Document Title
SDCWA PIPELINE 4-B, PHASE II
Document Type
EIR - Draft EIR
Received
Document Description
THE SDCWA WATER DISTRIBUTION PLAN (WDP) IS A CAPITAL IMPROVEMENT PROGRAM TO INCREASE THE CAPACITY, RELIABILITY, OPERATIONAL FLEXIBILITY AND YEILD OF THE EXISTING AQUEDUCT SYSTEM. THE PROPOSED IMPROVEMENTS TO THE SECOND SAN DIEGO AQUADUCT, WHICH ARE PART OF THE WDP, ARE SHOWN IN FIGURE 2. PIPELINE 4B, PHASE II (4B11) WILL BE A 96 INCH DIAMETER TREATED WATER PIPELINE. THIS 2 1/2 MILE SECTION WILL CONNECT PIPELINE 4B, PHASE I, AT THE NORTH END TO PIPELINE 4 EXTENTION, PHASE I, AT THE SOUTH END.
Contact Information
Name
MIKE STIFT
Agency Name
SAN DIEGO COUNTY WATER AUTHORITY
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Diego, SAN DIEGO/MISSION HILLS
Counties
San Diego
Cross Streets
MISSION GORGE ROAD
State Highways
I-15
Waterways
SAN DIEGO RIVER
Township
15-S
Range
2-W
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
Air Pollution Control Dist./Air Quality Mgmt. Dist., California Department of Conservation (DOC), California Department of Fish and Wildlife, Habitat Conservation Planning (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Department of Transportation, District 11 (DOT), California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California State Lands Commission (SLC), Department of Water Resources
Development Types
Water Facilities (conveyance)
Local Actions
PIPELINE CONSTRUCTION
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.