SCH Number 1987122222
Project Info
- Title
- Yolanda Avenue Widening Project
- Description
- The Yolanda Avenue Widening Project between Santa Rosa Avenue on the west and Petaluma Hill Road on the east (a distance of about 2,800 feet) is to include the acquisition of additional right-of-way, and roadway widening consisting of one 12-foot wide travel lane in each direction with a center 12-foot wide two-way left turn lane. Five-foot wide bike lanes area also to be constructed on both sides of the road with a concrete curb and gutter and storm drain on the north side. In addition, an asphalt curb and five-foot wide asphalt walkway is to be constructed on the south side of the road to control runoff and provide for pedestrian movement.
8 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
SIR | City of Santa Rosa | Yolanda Avenue Widening Project | |
NOD | City of Santa Rosa | Farmers Lane Extension | |
NOD | City of Santa Rosa | Farmers Lane Extension | |
SIR | City of Santa Rosa | Farmers Lane Extension | |
NOP | City of Santa Rosa | Farmers Lane Extension | |
NOP | City of Santa Rosa | Kawana-Ralphine Water Pipeline | |
EIR | City of Santa Rosa | Farmers Lane Extension Study | |
NOP | City of Santa Rosa | Farmers Lane Extension Study |