Flume 45 Critical Water System Infrastructure Project
2 Documents in Project
Summary
SCH Number
2024091018
Lead Agency
El Dorado Irrigation District
Document Title
Flume 45 Critical Water System Infrastructure Project
Document Type
EIR - Draft EIR
Received
Present Land Use
Natural Resources, Forest Resources - 160-acre minimum.
Document Description
Flume 45 is a critical component of the El Dorado Irrigation District's water conveyance system for the El Dorado Hydroelectric Project (Project 184). The Project would remove the existing wooden flume, which is highly susceptible to damage and destruction by natural hazards including wildfires, landslides, and falling trees and rocks, and replace it with a more durable ignition resistant concrete conveyance structure (i.e., U shaped concrete canal). The Project requires the removal and demolition of approximately 1,140 linear feet of water conveyance, which includes a wooden flume, wooden substructure, and a historic hand-stacked rock wall. Construction of the new conveyance structure involves construction of a mechanically stabilized earth retaining wall, construction of a new U-shaped concrete canal, slope stabilization, replacement of an existing maintenance access bridge that spans the water conveyance structure, and improvements along a maintenance access road adjacent to the flume. As part of the Project, EID would also perform routine road maintenance activities along the primary access road to allow for construction and continued maintenance access to the new canal segment. The Project would be constructed during the District’s annual maintenance outages, beginning in August 2026 and ending in January 2028. The first construction period would occur between August 2026 and January 2027 and the second would occur between August 2027 and January 2028.
Contact Information
Name
Michael Baron
Agency Name
El Dorado Irrigation District
Job Title
Environmental Review Analyst
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Name
Erick Cooke
Agency Name
GEI Consultants
Job Title
Project Manager
Contact Types
Consulting Firm
Phone
Location
Coordinates
Cities
Riverton
Counties
El Dorado
Regions
Countywide
Cross Streets
Camp P Road
Zip
95726
Total Acres
5
Jobs
20
Parcel #
011110025
State Highways
50
Railways
None
Airports
None
Schools
None
Waterways
South Fork American River
Township
11N
Range
14E
Section
30
Base
Meridian
Other Location Info
Project is located on lands managed by the Eldorado National Forest
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Habitat Conservation Planning (CDFW), California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of State Parks, Division of Boating and Waterways, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 3 (DOT), California Department of Water Resources (DWR), California Energy Commission, California Fish and Game Commission (CDFGC), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Delta Protection Commission, Delta Stewardship Council, Office of Historic Preservation, San Francisco Bay Conservation and Development Commission (BCDC), Sierra Nevada Conservancy, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 9, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Other (Water Conveyance)
Local Actions
Water conveyance flume replacement
Project Issues
Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Tribal Cultural Resources, Wildfire
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.