Northstar 1: WSA /GPA#23-0001/ZC#23-0001/CUP#23-0005/CUP#23-0006/IS #24-0001
2 Documents in Project
Summary
SCH Number
2024060951
Lead Agency
Imperial County
Document Title
Northstar 1: WSA /GPA#23-0001/ZC#23-0001/CUP#23-0005/CUP#23-0006/IS #24-0001
Document Type
NOD - Notice of Determination
Received
Posted
2/18/2025
Document Description
The applicant, Apex Energy Solutions, LLC proposes the NorthStar 1 Solar Energy Generation and Battery Storage Project which consists of the construction and operation of a 50-megawatt (MW) solar photovoltaic (PV) energy generation facility with up to a 75-megawatt (MW) battery storage (BESS) component. The project includes solar energy generation facility, battery storage system, an on-site substation, and an off-site transmission line to connect to the Imperial Irrigation District's existing 161 kV "N" Line. The ultimate energy output is dependent on several variables, including off-take arrangements and the evolving efficiency of PV panels.
Contact Information
Name
Jim Minnick
Agency Name
Planning and Development Services
Job Title
Director
Contact Types
Lead/Public Agency
Phone
Name
Apex Energy Solutions, LLC
Agency Name
Applicant
Job Title
Applicant
Contact Types
Project Applicant
Phone
Email
Location
Cities
Calipatria
Counties
Imperial
Regions
Countywide
Zip
92233
Parcel #
003-110-005-001
Other Location Info
8997 Wilkins Road
Notice of Determination
Approving Agency
Imperial County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
County Clerk
Imperial
Final Environmental Document Available at
Imperial County Planning & Development Services Department, 801 Main St, El Centro, CA 92243
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.