West Side Storage Tank Project

Summary

SCH Number
2024041239
Lead Agency
Caruthers Community Services District
Document Title
West Side Storage Tank Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
The Project area is surrounded by agricultural lands, ruderal vacant lots, and residential development. The Project site is located within vacant land zoned R-A (Single-Family Residential, Agricultural) by Fresno County.
Document Description
The West Side Water Storage Tank Project would construct a 500,000-gallon water storage tank whose dimensions would be approximately 22-feet high and 65-feet in diameter. Appurtenant infrastructure includes electrical equipment, on-site lighting, booster pumps, an emergency backup generator, seven-foot-tall, slatted perimeter fencing, and a basin for stormwater and storage tank backwash purposes. The facility would replace the existing 6-inch water main in Caruthers Avenue between the western edge of the District and Marks Avenue to a 10-inch transmission main. In a second phase, improvements would include a groundwater well and a granulated activated carbon (GAC) treatment process to increase system reliability and redundancy, should a well on the east side of the District go offline and another source of clean, reliable water is needed.

Contact Information

Name
David McIntyre
Agency Name
Caruthers Community Service District
Job Title
District Engineer
Contact Types
Lead/Public Agency / Project Applicant

Name
Jarred Olsen
Agency Name
Provost & Pritchard Consulting Group
Job Title
Senior Planner
Contact Types
Consulting Firm

Location

Cities
Caruthers
Counties
Fresno
Regions
Northern California
Cross Streets
southeast corner of Caruthers Avenue and Benedict Avenue, west of Marks Avenue
Parcel #
041-280-89
Township
16S
Range
19E
Section
13
Base
MDMB
Other Location Info
The Project is located in southern Fresno County, central California, approximately 168 miles southeast of Sacramento and 94 miles northwest of Bakersfield. The Project site is located at the southeast corner of Caruthers Avenue and Benedict Avenue, west of Marks Avenue on Assessor’s Parcel Number 041-280-89. The centroid of the Project site is 36°32'21.8"N 119°50'53.7"W.

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 6 (DOT), California Department of Water Resources (DWR), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Central Valley Flood Protection Board, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Rights
Development Types
Other (Water Storage Tank)
Local Actions
Water Storage Tank
Project Issues
Biological Resources, Cultural Resources, Tribal Cultural Resources

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print