Spring Mountain Road Winery "dba Titanium Winery" Use Permit Minor Modification (P23-00198) and Viewshed application (P23-00263)

2 Documents in Project

Summary

SCH Number
2024031117
Lead Agency
Napa County
Document Title
Spring Mountain Road Winery "dba Titanium Winery" Use Permit Minor Modification (P23-00198) and Viewshed application (P23-00263)
Document Type
NEG - Negative Declaration
Received
Present Land Use
Use: Winery / Zoning: Agricultural Watershed / General Plan: Agricultural, Watershed, and Open Space
Document Description
The Use Permit Minor Modification and Administrative Viewshed would allow the winery to: 1) Construct a new 901 sq. ft. winery building containing 166 sq. ft. of production space and 735 sq. ft. for accessory uses; (2) Construct a new 400 sq. ft. covered tasting terrace; (3) Construct a new 4,632 sq. ft. Type-3 cave, with two (2) access portals; (4) Construct a new 758 sq. ft. covered crush pad; (5) Install 175 sq. ft of replacement landscaping; (6) Install a new firetruck turn around area; (7) Install one new parking space for a total of six (6) parking spaces (2 employee, 3 guest, and 1 ADA accessible); (8) Install a waste water system for hold and haul; (9) Expand an existing and install a new access road to meet Napa County Roads and Street Standards for commercial driveways; and, (10) Install one 50,000 gallon fire suppression water tank, located on the west side of the winery structure. The proposed total size of the modified winery will be 5,533 sq. ft., including 1,148 sq. ft. covered areas. There is no change to the previously approved annual wine production capacity, number of employees, hours of operation, tours and tastings by appointment or marketing events. The project also includes a review of the proposed winery building and cave portals under the Viewshed Protection Program (Chapter 18.106 of the Napa County Code (NCC)) to review the visibility of the new construction from County designated Viewshed roads. The winery is proposed to be moved to a different location. Prior to the Glass Fire, the tasting room, storage building, and office/cellar were located south of Spring Mountain Road, and north of the residence. The barrel storage area was located at the south of the property (near the water cistern). The new winery building, and cave is proposed to be located approximately 300 feet to the west of Spring Mountain Road. No road setback variance will be required with this new location.

Contact Information

Name
Atkins, Wendy
Agency Name
County of Napa
Job Title
Planner II
Contact Types
Lead/Public Agency

Name
Justin Moody
Agency Name
Titanium Winery
Job Title
Owner
Contact Types
Project Applicant

Name
Kirsten Shinnamon Baker
Agency Name
Signum Architecture
Job Title
Architect
Contact Types
Consulting Firm

Location

Cities
Uniincorperated area
Counties
Napa
Regions
Unincorporated
Cross Streets
Langtry Road
Zip
95474
Total Acres
15.9
Jobs
1
Parcel #
022-260-004-000; 022-260-004-000
State Highways
0
Railways
0
Airports
0
Schools
0
Waterways
0
Township
8N
Range
6W
Section
27
Base
MDM

Notice of Completion

Development Types
Other (Winery)
Local Actions
Use Permit
Project Issues
Land Use/Planning
Local Review Period Start
Local Review Period End

Attachments

Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from State Reviewing Agency(ies)]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print