Wolf Reservoir and Booster Replacement Project

2 Documents in Project

Summary

SCH Number
2024030220
Lead Agency
City of Big Bear Lake
Document Title
Wolf Reservoir and Booster Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/24/2024
Document Description
The Project consists of the installation and operation of a new 612,000-gallon water storage reservoir tank that will replace the existing 100,000-gallon (24’ high, 24’ diameter) Wolf Reservoir. The project also includes replacing the existing pump station at the project site with a new Booster Pumping Station, including concrete block building and a metal roof. The new steel tank that will be approximately 36 feet in height and 58 feet in diameter. The project site will be graded and lowered about 8.5 feet to a base elevation of 7,406.66 feet above mean sea level (AMSL). The high-water line will be at an elevation of approximately 7,437.66 feet AMSL. Additionally, the portion of the existing access road located within the project site will be improved. The new welded steel tank will maintain about four feet of freeboard to protect the reservoir from sloshing damage during an earthquake. Also, the steel I-beam roof rafters will be constructed on the exterior of the roof to provide additional protection during an earthquake from sloshing damage. The proposed foundation system will be a reinforced concrete ring wall foundation system. The maximum safe soil bearing pressure for dead plus live loads will be 4,000 pounds per square foot (PSF). Associated site improvements will consist of new inlet/outlet piping, and drainpipes, installing a side outlet universal joint, new site pavement improvements, and chain-link fencing as needed to control potential trespass.

Contact Information

Name
Reginald A. Lamson
Agency Name
City of Big Bear Lake Department of Water and Power
Job Title
General Manager
Contact Types
Lead/Public Agency

Location

Cities
Big Bear Lake
Counties
San Bernardino
Regions
Southern California
Cross Streets
northeast corner of the intersection of Wolf Road and Coyote Court

Notice of Determination

Approving Agency
City of Big Bear Lake, Department of Water and Power
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
BBLDWP's office at 41972 Garstin Drive, Big Bear Lake, CA 92315 or online at www.bbldwp.com

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print