Well No 8
2 Documents in Project
Summary
SCH Number
2024020667
Lead Agency
Riverdale Public Utility District
Document Title
Well No 8
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
R-1/Medium Density Residential
Document Description
The Project would consist of the construction of a new potable water well for the community of Riverdale. The Project is intended to supplement the community’s water supply system by constructing a new well site and associated infrastructure including but not limited to: well pump, site piping and appurtenant infrastructure, motor control center and structure, electrical connection and transformer, emergency generator, chemical storage enclosure, a ponding basin for site drainage, site lighting, site grading, and site fencing. This Project will help address fire flow, system redundancy, pressure, looping concerns throughout the District, and provide additional drought resiliency for the community. The well Project site will be located on an approximately 1.8-acre parcel acquired by the District, located behind the Saint Ann Church on W. Mt Whitney Avenue on Assessor’s Parcel Number 053-260-21.
Along with construction of the new well site, accompanying infrastructure will include the installation of new water mains and the replacement of an aging, undersized water main near the Project site and the existing Well No. 6 site. Approximately 6,200 linear feet of 10-inch water main will be constructed along W. Wood Avenue, S. Marks Avenue, W. Kruger Avenue, and S. Feland Avenue within the existing road right of way. The proposed water main alignment will replace the existing undersized 4-inch water main and provide a new stretch of 10-inch distribution main for better connectivity between Well 6 in the southeast area and the rest of the system. In order to connect the Project site to the distribution system, approximately 600 LF of 12-inch water main will be installed along the north side of the Burrel Ditch canal from S. Feland Avenue to the Project well site. The Project will also incorporate the construction of an onsite retention basin for site drainage. The basin will be constructed on the northwest portion of the well site. The basin will be designed per Fresno Metropolitan Flood Control District design standards for a 100-year, 10-day storm (approximately 6 inches of rainfall depth) and will retain approximately 0.75 acre-feet of water. Drainage infrastructure will be constructed (inlets and piping) as needed for runoff and well flushing and will outlet to the basin. An additional basin will be constructed for the Church that is located north of the Project site since the new well site will take the area that property currently drains, this basin will have the same design criteria, with a total volume of 0.65 ac-ft.
The design of the Well 8 site will be similar to Well 6 and Well 7 to be consistent with well infrastructure across the District. Based on prior studies and design of other wells in and around Riverdale, it is expected that Well 8 will be approximately 2,000 feet deep and be sealed down to a depth at least below the Corcoran Clay and will be designed with a desired pumping capacity of 1,350 gallons per minute. Arsenic,
color, and Total Organic Carbon are expected to be present, but at levels below the current maximum contaminant level. While it is not anticipated that the water quality at the Well No. 8 site will require treatment, a portion of the site has been planned for future treatment facilities if the District needs additional treatment. The District has also planned space for a water storage tank should the system need additional operational storage capacity at any point in the future.
Contact Information
Name
Vincent Romero
Agency Name
Riverdale Public Utility District
Job Title
District Superintendent
Contact Types
Lead/Public Agency
Phone
Email
Name
Amy M. Wilson
Agency Name
Provost & Pritchard Consulting Group
Job Title
Senior Planner
Contact Types
Consulting Firm
Phone
Email
Location
Coordinates
Cities
Riverdale
Counties
Fresno
Regions
Southern California
Cross Streets
West Mount Whitney Avenue & South Marks Avenue
Zip
93656
Total Acres
1.8
Parcel #
053-260-21
Schools
Riverdale High School
Township
17S
Range
19E
Section
25
Base
MDMB
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Housing and Community Development (HCD), California Department of Parks and Recreation, California Department of Resources Recycling and Recovery, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 6 (DOT), California Department of Water Resources (DWR), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Office of Historic Preservation, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, State Water Resources Control Board, Division of Drinking Water
State Reviewing Agency Comments
State Water Resources Control Board, Division of Drinking Water
Development Types
Other (Groundwater Well/Pipeline)
Local Actions
Groundwater Well
Project Issues
Biological Resources, Cultural Resources, Geology/Soils
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from State Reviewing Agency(ies)]
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.