City of Redding Pump Station 1 Replacement Project

2 Documents in Project

Summary

SCH Number
2024010756
Lead Agency
City of Redding
Document Title
City of Redding Pump Station 1 Replacement Project
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Greenway, Open Space
Document Description
The City of Redding Pump Station 1 Replacement Project (project) involves the construction of a new state-of-the-art fish screen, intake, and pumping plant to replace the existing Pump Station (PS) 1, which has reached the end of its useful life. The new PS1 would be located along the right riverbank of the Sacramento River, approximately 0.3 miles upstream of the Diestlehorst Bridge and approximately 0.7 mile upstream of the Anderson-Cottonwood Irrigation District (ACID) dam in the City of Redding (City). The project would also restore Jenny Creek to an open channel along its historical alignment and remove the existing Jenny Creek culverts. Additional facilities included in the Project include a public restroom, underground utilities, new access roads which would also serve as a connection between the Jenny Creek Trail and the Sacramento River Trail, and demolition of the existing PS1 facility and restoration of the site to a native condition once the new PS1 has been commissioned.

Contact Information

Name
Amber L Kelley
Agency Name
City of Redding
Job Title
Environmental Compliance Manager
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Redding
Counties
Shasta
Regions
Citywide
Cross Streets
Mary Street and Overhill Drive
Zip
96001
Parcel #
103-730-002-000
State Highways
273, 299
Railways
Union Pacific Railroad
Airports
Benton Airpark
Schools
Sequoia Middle, Shasta High, University Preparatory, Manzanita
Waterways
Sacramento River, Jenny Creek, Dix Creek
Township
32N
Range
5W
Base
USGS
Other Location Info
The project is on the southern bank of the Sacramento River approximately 0.3 mile upstream of the Diestelhorst Bridge.

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of State Parks, Division of Boating and Waterways, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 2 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Redding Region 5 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 9, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Divison of Financial Assistance, California Department of Fish and Wildlife, Northern and Eureka Region 1 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, Northern and Eureka Region 1 (CDFW)
Development Types
Water Facilities (Pump House)(Type Replacement , MGD 42)
Local Actions
Use Permit
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Noise, Recreation, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]
State Comment Letters [Comments from State Reviewing Agency(ies)]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print