Hidden Canyon Test West Production Plan
3 Documents in Project
Summary
SCH Number
2023090412
Lead Agency
Santa Barbara County
Document Title
Hidden Canyon Test West Production Plan
Document Type
NOD - Notice of Determination
Received
Posted
8/7/2024
Document Description
The Applicant, West Bay Exploration, is requesting approval of an Oil & Gas Drilling Production Plan {Case No 22PPP-00000-00001) to grade one new well pad, approximately 0.996-acres in size (140' x 310'), and drill one new test well for oil and gas exploration. The Target Depth of the formation is approximately 11,000-feet below ground level. No permanent facilities are proposed besides the single wellhead following drilling operations. If the drilling program is successful, the applicant will return with a new Production Plan request for the production phase. If the drilling program is not successful, the well will be abandoned.
Well Drilling. Preparation and grading of the drill site will take approximately 5 days to complete. During site preparation activities the site will be graded, watered and compacted to establish a level and solid foundation for the drilling rig. Topsoil will be stabilized. Drilling of the Well will last up to 24 days. This will include mobilization and demobilization of the drill rig and installation of blowout prevention equipment, cementing, mud-logging, etc. required for the drilling phase. Non-hazardous waste (primarily drilling mud and cuttings) will be a product of this phase and it will be transported McKittrick.
Equipment required for completion of Phase 1 includes, a drilling rig (Ensign 540 or equivalent): CARB PERP-registered diesel-powered ICE {3x1350 bhp, 1x 100 bhp) and five generators less than 50 bhp each for the site offices. Grading includes 4,521-cubic-yards of cut and 5,482-cubic-yards of fill to account for the 25% compaction factor for shrinkage over a 10% grade. Therefore 961-cubic yards will be imported.
Abandonment. If the test phase is not successful, the well will be abandoned. No gas production is proposed as a part of the project. There are no permanent facilities proposed except for the single wellhead following successful drilling operations. All drilling, production and appurtenant equipment will be removed. One daily operator site visit will occur to ensure compliance with Code and well safety requirements. Abandonment of the well will comply with standards outlined in the Petroleum Code Section 25-31.
The site is accessed by School House Canyon Road and is approximately 0.85-miles southwest of CA SR 166 on APN 147-020-045, which is approximately 6,565-acres and zoned Ag-11-100. The road will not need improvements. During operational hours, site access will be controlled by staff on location. During non-operational hours, site access will be prohibited by the existing gates. Water will be obtained from an onsite well. The project is located in the First Supervisorial District.
Contact Information
Name
Katie Nall
Agency Name
County of Santa Barbara - Planning and Development
Job Title
Planner
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
New Cuyama
Counties
Santa Barbara
Regions
Unincorporated
Total Acres
1
Parcel #
147-020-045
State Highways
166
Waterways
Cuyama River
Township
11N
Range
20E
Section
35
Other Location Info
School House Canyon Road and is approximately 0.85-miles southwest of CA-SR 166
Notice of Determination
Approving Agency
County of Santa Barbara
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Barbara
Final Environmental Document Available at
https://www.countyofsb.org/160/Planning-Development
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.