Arroyo Grande High School Auxiliary Gymnasium Project Notice of Determination

2 Documents in Project

Summary

SCH Number
2023060716
Lead Agency
Lucia Mar Unified School District
Document Title
Arroyo Grande High School Auxiliary Gymnasium Project Notice of Determination
Document Type
NOD - Notice of Determination
Received
Posted
9/6/2023
Document Description
The proposed project includes the construction of a new 13,000-sf multipurpose gymnasium on a previously disturbed, undeveloped site. The project also includes the construction of a small parking lot with 10 ADA parking spaces and would require the extension of existing water, wastewater, and electrical infrastructure to the proposed gymnasium. The project would result in a total disturbance of approximately 1 acre, including approximately 4,200 cubic yards of cut and fill.

Contact Information

Name
Andy Stenson
Agency Name
Lucia Mar Unified School District
Job Title
Assistant Superintendent
Contact Types
Lead/Public Agency

Location

Counties
San Luis Obispo
Regions
Southern California
Cross Streets
Castillo Del Mar, Valley Road
Zip
93401
Total Acres
2.15
State Highways
US 101
Railways
N/A
Airports
N/A
Schools
Arroyo Grande High School
Waterways
Arroyo Grande Creek, Los Berros Creek
Township
32S
Range
13E
Section
28

Notice of Determination

Approving Agency
Lucia Mar Unified School District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Luis Obispo
Final Environmental Document Available at
https://www.aghseagles.org/apps/pages/index.jsp?uREC_ID=255972&type=d&pREC_ID=2302999

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print