Simms Park Stormwater Capture and Teen & Senior Center Projects
2 Documents in Project
Summary
SCH Number
2023060602
Lead Agency
City of Bellflower
Document Title
Simms Park Stormwater Capture and Teen & Senior Center Projects
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Stormwater Capture Project: park/ Open Space/ Open Space; Teen & Senior Center: vacant/ General Commercial/ General Commercial
Document Description
The City of Bellflower is considering two separate projects proposed near each other at Simms Park. The projects entail constructing and operating a stormwater capture and filtration facility within the eastern portion of the park and a Teen & Senior Center in the northwestern portion of the park, as well as other ancillary park improvements.
The stormwater capture project would construct underground infrastructure within Simms Park to divert stormwater runoff from an existing storm drain in Clark Avenue into a concrete storage reservoir proposed beneath the baseball/softball fields. Prior to flow into the reservoir, runoff would be directed through a pre-treatment system to remove trash, sediments, and solids. Stormwater would be pumped out of the reservoir and through a media filter, allowing physical filtration prior to discharging the treated water back into the existing storm drain system. Following reservoir construction, the existing grass and dirt ballfields would be replaced by artificial turf surface. The project would construct new fencing, landscaping, and other park improvements.
The Teen & Senior Center project would construct a single-story, 12,355 square-foot building on City-owned property that was the site of an old teen center building demolished in 2019. The building would feature a reception area, community and youth rooms, offices, common space, kitchen, and an open patio. Configuration of the building access would require demolition of the City’s existing volunteer center building south of the Woman’s Club. The Simms Park parking lot would be reconfigured, including expansion to the east into a park area featuring ornamental landscape. The western driveway to the Simms Park parking lot along Oak Street would be removed to accommodate the new building and parking reconfiguration.
Contact Information
Name
Rowena Genilo
Agency Name
City of Bellflower
Job Title
Planning Manager
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Bellflower
Counties
Los Angeles
Regions
Citywide
Cross Streets
Clark Avenue and Oak Street
Zip
90706
Total Acres
8.0
Parcel #
7106-003-901, 7106-003-909, etc.
State Highways
SR-19, SR-91
Railways
Los Angeles County Metro Rail Sy
Airports
N/A
Schools
various
Waterways
San Gabriel River
Township
3S
Range
12W
Section
27
Base
San Bern
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 7 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy (RMC), State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Recreational (Teen & Senior Center)
Local Actions
General Plan Amendment, Rezone, Redevelopment
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.