UCSF Benioff Children's Hospital Oakland New Hospital Building

4 Documents in Project

Summary

SCH Number
2023050540
Lead Agency
University of California, San Francisco
Document Title
UCSF Benioff Children's Hospital Oakland New Hospital Building
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
UCSF is not subject to local zoning but is designated as Institutional per the City of Oakland General Plan and zoned Medical Center (S-1) per the Oakland Municipal Code.
Document Description
UCSF is proposing to construct a new hospital building and associated improvements at the UCSF BCH Oakland campus, collectively known as the New Hospital Building (NHB) Project, or Project. The Project would address seismic safety requirements and meet other regulatory requirements and industry standards for contemporary hospitals; increase inpatient beds; accommodate modern technologies; and enhance functionality and efficiency at the campus site. The Project would include the construction of 324,000 gsf 8-story above grade (plus basement level) new hospital building; an approximately 370 -stall, 5-story parking structure with a rooftop helistop; renovation and/or structural retrofitting of existing buildings within the NHB Project site; and a variety of transportation, infrastructure and landscape improvements. In total, when accounting for proposed demolition or relocation off-site, the Project would provide for development of approximately 215,000 net new gsf of building space; and renovation of approximately 11,000 gsf of building space. The UCSF BCH Oakland campus is not included in the UCSF 2014 Long Range Development Plan (LRDP) at the present time. As the UCSF BCH Oakland campus site is controlled by the University, UCSF proposes to amend the 2014 LRDP to include the UCSF BCH Oakland campus.

Contact Information

Name
Diane Wong
Agency Name
University of California, San Francisco
Job Title
Principal Planner
Contact Types
Lead/Public Agency

Location

Cities
San Francisco
Counties
San Francisco
Regions
San Francisco Bay Area
Cross Streets
Martin Luther King Boulevard Jr. Way & 52nd Street
Parcel #
14-1205-19-1, 14-1204-14-5, and 14-1204-15
State Highways
State Route 24
Railways
Bay Area Rapid Transit

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Natural Resources Agency, California Office of Statewide Health Planning and Development (OSHPD), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Water Quality, California Native American Heritage Commission (NAHC), California Department of Conservation (DOC), California Department of Transportation, District 4 (DOT)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), California Department of Conservation (DOC), California Department of Transportation, District 4 (DOT)
Development Types
Other (Hospital - 324,000 gsf (215,000 net new gsf))
Local Actions
Redevelopment
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation
Public Review Period Start
Public Review Period End

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print