Northstar Community Services District Wood Energy Facility (SNC 1641)

5 Documents in Project

Summary

SCH Number
2023040571
Lead Agency
Northstar Community Services District
Document Title
Northstar Community Services District Wood Energy Facility (SNC 1641)
Document Type
NOD - Notice of Determination
Received
Posted
3/11/2024
Document Description
The Sierra Nevada Conservancy (SNC) would be funding the community-scale wood energy system that will consist of two hot water boilers, which would be heated by combustion of wood chips at a wood energy utility facility and a thermal energy distribution pipeline connected to existing heating systems within approximately 14 buildings and facilities, including residential and commercial spaces, swimming pools/spas, and potentially the snow melt system for the Village at Northstar plaza. The SNC’s funds would specifically be used to pay a portion of the cost of constructing a cross-laminated timber building to house the boiler system.

Contact Information

Name
Mary Akens
Agency Name
Sierra Nevada Conservancy
Job Title
Legal Counsel
Contact Types
Responsible Agency

Location

Cities
Northstar
Counties
Placer
Regions
Northern California
Other Location Info
908 Northstar Drive, north of the Northstar Fire Station located at 910 Northstar Drive on the same parcel, Northstar, Placer County.

Notice of Determination

Approving Agency
Sierra Nevada Conservancy
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Placer
Final Environmental Document Available at
Sierra Nevada Conservancy, 11521 Blocker Drive Suite 205, Auburn, CA 95603

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print