Project #U22-0031 (Thiara)

2 Documents in Project

Summary

SCH Number
2023040472
Lead Agency
Sutter County
Document Title
Project #U22-0031 (Thiara)
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Fallow field/ ER (Estate Residential) / ER (Estate Residential)
Document Description
A Rezone of 16.12 acres from ER (Estate Residential District) to ER-PD (Estate Residential, Planned Development Combining District) and a Tentative Subdivision Map to create eight residential lots. The proposed parcels will range in size from 1.52 – 2.31 acres and with a proposed density of 0.5 dwelling units per acre. The project includes construction of a private roadway within a 40-foot street-section to access Parcels 2-8. The project proposes to subdivide the project site and construct the required subdivision improvements including roadway, drainage, and utilities, and does not propose construction of any dwellings. Homes to be constructed in the proposed subdivision would be considered under a future separate permit. The entrance into the subdivision is offset 60 feet from the right-of-way to accommodate the installation of a gate at a later date.

Contact Information

Name
Casey Murray
Agency Name
Sutter County Development Services Department
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Bakshinder Thiara
Agency Name
Applicant
Job Title
Applicant
Contact Types
Project Applicant

Name
George L. Musallam
Agency Name
North Valley Engineering and Surveying
Job Title
PE, LS
Contact Types
Consulting Firm

Location

Cities
unincorporated area
Counties
Sutter
Regions
Countywide, Northern California, Unincorporated
Cross Streets
Northwest corner of Barry and Muir Road
Zip
95991
Total Acres
16.12
Parcel #
23-064-016, 23-064-005
State Highways
99
Railways
None
Airports
None
Schools
Barry Elementary School
Waterways
Feather River, Gilsizer Slough
Township
14N
Range
03E
Section
10
Base
MDB&M

Notice of Completion

Development Types
Residential (Units 8, Acres 16.12)
Local Actions
Rezone, Land Division (Subdivision, etc.)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print