Live Oak Canal Bridge Replacement — SUTTER COUNTY

3 Documents in Project

Summary

SCH Number
2023040298
Lead Agency
Sutter County
Document Title
Live Oak Canal Bridge Replacement — SUTTER COUNTY
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2023
Document Description
The Live Oak Canal Bridge (Bridge No. 18C0106) is located on the eastern edge of Sutter County, between Yuba City and Live Oak, on Sanders Road at the intersection with Larkin Road. The County is proposing to replace the bridge due to low sufficiency rating and poor intersection geometry. The new structure would allow truck turning for California Legal Trucks to and from Larkin Road onto Sanders Road. The proposed bridge replacement is planned to be a precast or cast-in-place, reinforced concrete double-celled box culvert (box culvert) with overall (gross) dimensions of about 13.9 feet (ft) wide by 105.5 ft long. The Proposed Project is currently partially funded through SB 1 and local funds. Construction is anticipated to begin in Spring 2024. During construction, Sanders Road between Larkin Road and Broadway will be closed to through traffic. However, residents that live within the closed portion of Sanders Road will still be able to access their homes and property via the Sanders Road/Broadway intersection or via Madden Avenue.

Contact Information

Name
Scott Riddle
Agency Name
Sutter County
Job Title
Senior Civil Engineer
Contact Types
Lead/Public Agency

Location

Cities
Live Oak
Counties
Sutter
Regions
Citywide
Cross Streets
Sanders Road and Larkin Road
Total Acres
4.78
Waterways
live Oak Slough
Other Location Info
The Live Oak Canal Bridge (Bridge No. 18C0106) is located on the eastern edge of Sutter County, between Yuba City and Live Oak, on Sanders Road at the intersection with Larkin Road

Notice of Determination

Approving Agency
County of Sutter
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sutter
Final Environmental Document Available at
1130Civic Center Blvd., Yuba City, CA 95993

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print