Twentynine Palms Wastewater Reclamation Project Phase I

2 Documents in Project

Summary

SCH Number
2023030560
Lead Agency
City of Twentynine Palms
Document Title
Twentynine Palms Wastewater Reclamation Project Phase I
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Various
Document Description
Phase 1 of the proposed Wastewater Reclamation Project is centrally located within City limits and is generally bounded by Amboy Road to the north, Bagdad Highway to the east, Baseline Road to the south, and Morongo Road to the west. The Project consists of a +27 mile sewer collection system and a wastewater treatment plant (WWTP) with a peak treatment capacity of 2.25 MGD. Phase 1 project planned to be completed by the end of 2026.

Contact Information

Name
Keith Gardner
Agency Name
City of Twentynine Palms
Job Title
Planning Dept.
Contact Types
Lead/Public Agency

Name
Kelly Clark
Agency Name
Terra Nova Planning & Research, Inc.
Job Title
Senior Planner
Contact Types
Consulting Firm

Location

Cities
Twentynine Palms
Counties
San Bernardino
Regions
Southern California
Cross Streets
Amboy Road to the north, Bagdad Highway to the east, Baseline Road to the south, and Morongo Roa
Zip
92277
Total Acres
+30
Parcel #
various
State Highways
62
Railways
N/A
Airports
N/A
Schools
various
Waterways
N/A

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Coachella Valley Mountains Conservancy (CVMC), California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 8 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Colorado River Basin Region 7 (RWQCB), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Other (Sewer collection system), Waste Treatment:Other (WWTP)(MGD 2.25)
Local Actions
Funding package
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print