Mountain View Downtown Precise Plan Update

Summary

SCH Number
2022120277
Lead Agency
City of Mountain View
Document Title
Mountain View Downtown Precise Plan Update
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2022
Document Description
The proposed update to the Downtown Precise Plan would convert several existing design guidelines into standards and add new design standards in subareas A, G, and H. The proposed project would not change the maximum development assumed for the Precise Plan in the original 1988 Precise Plan, subsequent Precise Plan amendments, or Mountain View 2030 General Plan. The proposed update would institute a maximum FAR in Subarea H where no maximum currently exists. The maximum FAR would be consistent with the density currently allowed in area H. No increases to the allowed parking requirements, or overall allowed development intensities are proposed. As a result, the proposed updates would primarily change the design outcomes of new buildings in subareas A, G, and H, with the intent of maintaining the existing look and feel of those Precise Plan subareas.

Contact Information

Name
Edgar Maravilla
Agency Name
City of Mountain View
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
Mountain View
Counties
Santa Clara
Regions
Citywide
Cross Streets
Castro Street/Central Expressway, Castro Street/El Camino Real
Zip
94041
Total Acres
130
State Highways
SR 85, SR 237
Railways
Caltrain, VTA
Airports
Moffett Federal Airfield
Schools
View High School, Landels Elementary School
Waterways
Stevens Creek
Other Location Info
Precise plan is 130 acres in size and spans two blocks on either side of Castro Street from Central Expressway to El Camino Real in Downtown Mountain View.

Notice of Determination

Approving Agency
City of Mountain View
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
https://www.mountainview.gov/depts/comdev/planning/activeprojects/downtownupdate.asp

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print