Burlingame WWTF Digester Improvements Project

Summary

SCH Number
2022120255
Public Agency
City of Burlingame
Document Title
Burlingame WWTF Digester Improvements Project
Document Type
NOE - Notice of Exemption
Received
Posted
12/12/2022
Document Description
The City of Burlingame (City) owns a WWTF with a permitted design flow of 5.5 million gallons per day (mgd) on an average dry weather flow (ADWF) basis. The Plant provides secondary treatment of wastewater and discharges the treated effluent to the North Bayside System Unit force main, which ultimately discharges into Lower San Francisco Bay via a deep-water outfall. The City’s WWTP uses anaerobic digestion to stabilize sludge prior to dewatering by a belt filter press or centrifuge before the dewatered sludge is trucked off site to a landfill or land application site for disposal. The existing anaerobic digestion facilities, which include two digesters, a sludge storage tank, and an equipment room, are aging and require replacement to improve the overall performance and reliability of the anaerobic digestion process. Construction of the Proposed Project is planned to start on September 1, 2023 and will take approximately 30 months of continuous work to complete.

Contact Information

Name
steve brown
Agency Name
SMB Environmental, Inc.
Job Title
Principal
Contact Types
Parties Undertaking Project

Name
Kathleen Keylon
Agency Name
City Of Burlingame
Job Title
Senior Planner
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Burlingame
Counties
San Mateo
Regions
Citywide
Cross Streets
1103 Airport Boulevard and HWY 101
Zip
94010
Total Acres
1
Airports
San Francisco

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 1, 2, and 3
Reasons for Exemption
The Proposed Project has been determined to meet the requirements of the exemption(s) selected above and will not have a significant impact on the environment including, but not limited to, biological and cultural resources. The Proposed Project consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structures to be replaced and will have substantially the same purpose, size, and capacity as the structures to be replaced. The Proposed Project also includes limited new construction at the existing WWTF to improve the overall performance and reliability of the anaerobic digestion process.
County Clerk
San Mateo

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.