Phases 2 and 3 of Ardenwood Creek (Zone 5 Line P) Flood Control Channel Improvement Project Fremont, California
2 Documents in Project
Summary
SCH Number
2022120141
Lead Agency
Alameda County Flood Control and Water Conservation District
Document Title
Phases 2 and 3 of Ardenwood Creek (Zone 5 Line P) Flood Control Channel Improvement Project Fremont, California
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Open Space
Document Description
The purpose of the project is to improve hydraulic conveyance of the channel to meet Federal Emergency Management Agency (FEMA) flood protection standards. The project would be constructed in three phases and Phase 1 has already been completed. Phase 2 would restorepositive drainage to the earth channel by removing sediment from an approximately 2,600 LF section of the Ardenwood Creek flood control channel from 0.4 mile downstream of Paseo Padre Parkway to the Patterson Ranch Road crossing. Phase 3 would remove deteriorating culverts further
downstream at Patterson Ranch Road and the adjacent Tuibun Trail, the Chochenyo trail crossing, and the Demonstration Urban Stormwater Treatment (D.U.S.T.) Marsh trail crossing and replace them with clear span prefabricated bridges supported by abutments placed beyond the top of bank. The bridge foundations would be protected from scour by rock placed on the creek bank. One of the Project objectives is to reduce the slow spread of the cattail marsh and encourage more desirable seasonal wetlands occupied by pickleweed and other desirable native plant species. The
Project would accomplish this by helping to manage the high groundwater table through the deepened and positively drained Ardenwood Creek channel invert, and by removing cattails in the overbank area used for truck haulage of channel spoil. The replacement of the culverts, which restrict drainage, by clear span bridges, would also be beneficial by improving passage of flood flows, and creating new jurisdictional wetland and open water areas. Culvert to clear span bridge conversion would also help control the unwanted spread of cattails in wet and ponded areas. Phase 2 is planned for construction in the summer or fall of 2023, pending receipt of all regulatory permits. Phase 3 is planned for construction in 2024 or later, pending funding availability and separate permit acquisition. Construction may extend over two or more seasons depending on regulatory requirements and seasonal work windows.
Contact Information
Name
Jame Yoo
Agency Name
Alameda County Flood Control & Water Conservation District
Job Title
Associate Environmental Compliance Specialist
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Fremont
Counties
Alameda
Regions
San Francisco Bay Area
Cross Streets
The proposed project is located west of Paseo Padre Parkway, north and south of Patterson Ranch
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 4 (DOT), California Department of Water Resources (DWR), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW)
Development Types
Other (Flood Control)
Local Actions
General Plan Update
Project Issues
Air Quality, Biological Resources, Cultural Resources, Flood Plain/Flooding, Geology/Soils, Hydrology/Water Quality, Tribal Cultural Resources, Vegetation, Wetland/Riparian
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.