Parkline Master Plan Project

2 Documents in Project

Summary

SCH Number
2022120058
Lead Agency
City of Menlo Park
Document Title
Parkline Master Plan Project
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Commercial Land Use Designation; C-1(X) (Administrative and Professional District, Restrictive) zoning
Document Description
The Proposed Project would redevelop SRI International’s research campus by creating a new office and research and development (R&D), transit-oriented campus with no net increase in commercial square footage, up to 550 new rental housing units at a range of affordability levels, new bicycle and pedestrian connections, and 25 acres of publicly accessible open space. In total, the Proposed Project would result in a total of approximately 1,898,931 gross square feet (gsf), including approximately 1,380,332 gsf of office and R&D uses (including existing buildings to be retained) and approximately 518,599 gsf of residential uses (including up to 450 rental residential units, and excluding the up-to-100 affordable rental residential units, whose gsf will be determined at a later date). (The non-residential square footage may also include limited retail or other commercial, supporting uses.) The existing 6-megawatt natural gas power plant that generates power and steam energy for the existing SRI International campus would be demolished and the entire Project site would be converted to all-electric energy usage with the exception of two of the existing buildings that would remain (Buildings P and T), potential backup diesel generators and potential limited exceptions to accommodate life sciences uses.

Contact Information

Name
Corinna Sandmeier
Agency Name
City of Menlo Park
Job Title
Acting Principal Planner
Contact Types
Lead/Public Agency

Location

Cities
Menlo Park
Counties
San Mateo
Regions
Citywide
Cross Streets
Ravenswood Avenue/Middlefield Road/Laurel Street
Zip
94025
Total Acres
63.2
Parcel #
062-390-660; 062-390- 670; 062-390-730
State Highways
US 101, SR82
Railways
UPRR; Caltrain
Airports
N/A
Schools
Menlo-Atherton; Encinal
Waterways
N/A
Township
5S
Range
3W
Section
34

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Housing and Community Development (HCD), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Water Resources (DWR), California Energy Commission, California Governor's Office of Emergency Services (OES), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), Office of Historic Preservation, San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 17, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Divison of Financial Assistance, California Native American Heritage Commission (NAHC), California Department of Transportation, District 4 (DOT)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), California Department of Transportation, District 4 (DOT)
Development Types
Residential (Units 55, Acres 63.2), Recreational (25 acres), Water Facilities ( )(Type underground tank, MGD 2)
Local Actions
General Plan Amendment, Master Plan, Rezone, Land Division (Subdivision, etc.)
Project Issues
Aesthetics, Air Quality, Biological Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Vegetation
Public Review Period Start
Public Review Period End

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print