San Leandro Library Electric Vehicle Charging

Summary

SCH Number
2022110458
Public Agency
City of San Leandro
Document Title
San Leandro Library Electric Vehicle Charging
Document Type
NOE - Notice of Exemption
Received
Posted
11/18/2022
Document Description
East Bay Community Energy will install 11 dual-port direct current fast chargers (DCFC) and 2 single-port DCFCs at the San Leandro Main Library parking lot, located at 300 Estudillo Avenue. These chargers will be for public use and will be available 24/7. The Main Library parking lot is a municipally-owned parking facility and is located in an area with a high concentration of multi-family properties, creating previously unavailable access to electric vehicle fast charging for nearby renters, residents, and visitors.

Contact Information

Name
Andrew J. Mogensen, AICP
Agency Name
The City of San Leandro
Job Title
Planning Manager
Contact Types
Lead/Public Agency

Location

Cities
San Leandro
Counties
Alameda
Regions
San Francisco Bay Area
Cross Streets
Estudillo Avenue and Santa Rosa Street
Zip
94577
Total Acres
3.38
Parcel #
077 0551 001 00
State Highways
185
Railways
UPCC
Airports
Oakland International Airport
Schools
San Leandro Middle School
Waterways
San Leandro Creek
Other Location Info
San Leandro Public Library

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15304
Reasons for Exemption
The San Leandro Library Electric Vehicle Charging project consists of installation of new small equipment to an existing site. Specifically, the fast charging equipment to be installed is approximately the size of a pay phone and the level two charging equipment is the size of a parking meter. The equipment will be installed in an existing, paved parking lot. Therefore, the project falls within section 15304 and will not have a significant effect on the environment. Cal. Code Regs., tit. 14, sect. 15304 provides that projects which consist of minor public or private alterations in the condition of land, water, and/or vegetation which do not involve removal of healthy, mature, scenic trees except for forestry and agricultural purposes are categorically exempt from the provisions of CEQA. In this project, minor trenching may be necessary to lay two-inch conduit from the existing electrical panel to the charging equipment, totaling approximately 2 cubic feet per foot of distance from the electrical panel, to connect the proposed new electric vehicle charging station equipment to an existing electrical supply panel. The trenching will take place on currently paved ground, will not involve the removal of any trees, and surface will be restored. Therefore, the project falls within section 15304 and will not have a significant effect on the environment.
County Clerk
Alameda

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.