Aragon High School Baseball and Flex Fields Project
2 Documents in Project
Summary
SCH Number
2022090308
Lead Agency
San Mateo Union School District
Document Title
Aragon High School Baseball and Flex Fields Project
Document Type
NOD - Notice of Determination
Received
Posted
12/15/2022
Document Description
Reconfigure the existing baseball field into a 99,500 sq. ft. artificial turf baseball and flexfield. The flexfield would be used for football and soccer practices. Accessory facilities and elements for the proposed field include: batting cages, baseball diamond, partial football/soccer field striping, bullpens, dugouts, 30’ high backstop with 3’ high planking and padding, sideline and outfield fencing, 5-row bleachers on pavement (200-person capacity), sports lighting (lights on eight poles [6x70 feet high and 2x80 feet high]), benches, and ADA accessible walkways.
The artificial turf system would be typical polypropylene turf with olive-pit fill. The turf
would include four components: fiber, infill, backing and underlayment.
The project will include power to existing switchgear, connections to the existing onsite water line, and connection to the existing onsite storm drain.
Contact Information
Name
Yancy Hawkins
Agency Name
San Mateo Union High School District
Job Title
Chief Business Officer
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Location
Cities
San Mateo
Counties
San Mateo
Regions
Citywide
Cross Streets
Alameda de las Pulgas
Schools
Aragon High School
Notice of Determination
Approving Agency
San Mateo Union High School District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
County Clerk, County of San Mateo 555 County Center Redwood City, CA 94063
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.