Eddie Jones Warehouse, Manufacturing & Distribution Facility

2 Documents in Project

Summary

SCH Number
2022070365
Lead Agency
City of Oceanside
Document Title
Eddie Jones Warehouse, Manufacturing & Distribution Facility
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Light Industrial (LI) / Limited Industrial (IL)
Document Description
The proposed project consists of demolition of the existing vacant 172,300-square-foot industrial manufacturing building and associated improvements, and development of a new 566,905-square-foot warehouse and distribution facility. The proposed warehouse and distribution facility would consist of 369,415 square feet of warehouse area, 158,320 square feet of manufacturing space and 39,170 square feet of office area designed as a single building that could support multi-tenant occupancies. Separate office areas (with ground level and mezzanine level space) are planned at all four corners of the facility with associated warehouse/industrial space, adjacent parking, and access areas to facilitate multiple users. Development of the proposed project would include associated landscaping, stormwater features, 590 parking spaces for employee/visitor parking, 60 truck trailer parking stalls, and vehicle circulation area. Loading bays are proposed on the north and south sides of the building with a total of 114 truck terminals. Access to the project site would be maintained and improved as necessary with existing access points from Alex Road at the northeast corner, and Benet Road at the southwest corner. The Alex Road access would be limited to passenger vehicles while heavy truck traffic would be limited to the Benet Road access point.

Contact Information

Name
Rob Dmohowski
Agency Name
City of Oceanside
Job Title
Principal Planner
Contact Types
Lead/Public Agency

Location

Cities
Oceanside
Counties
San Diego
Regions
Citywide
Cross Streets
Eddie Jones Way and Benet Road
Zip
92058
Total Acres
31.79
Parcel #
145-021-29-00; 145-021-030-00; 145-021-032-00
State Highways
76, 5
Railways
n/a
Airports
Oceanside Municipal Airport
Schools
Mission Elementary School
Waterways
San Luis Rey River
Township
11S
Range
4W
Section
7
Base
San Bern

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Coastal Commission (CCC), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Resources Recycling and Recovery, California Department of Toxic Substances Control (DTSC), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, State Water Resources Control Board, Division of Water Quality, California Native American Heritage Commission (NAHC), California Department of Transportation, District 11 (DOT)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), California Department of Transportation, District 11 (DOT)
Development Types
Industrial (Number of employees is a conservative estimate.)(Sq. Ft. 566905, Acres 13, Employees 590)
Local Actions
Site Plan, Redevelopment
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print