State Route 121 Tulucay Creek Bridge Replacement Project
3 Documents in Project
Summary
SCH Number
2022060724
Lead Agency
California Department of Transportation, District 4
(DOT)
Document Title
State Route 121 Tulucay Creek Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2023
Document Description
The Project involves the replacement of the existing two-span, concrete Tulucay Creek Bridge (Bridge 21-0003) with a single-span, precast, pre-stressed, concrete box bridge (new Bridge 21-0109). The existing bridge is 45 feet long and 77 feet wide and has four 12-foot lanes (two in each direction), two 6-foot outside shoulders (one in each direction), and a 9-foot median.
Contact Information
Name
Nathan Roberts
Agency Name
California Department of Transportation (Caltrans) District 4
Job Title
Environmental Branch Chief (Acting)
Contact Types
Lead/Public Agency / Project Applicant
Address
Phone
Location
Counties
Napa
Regions
Countywide
State Highways
121
Notice of Determination
Approving Agency
California Department of Transportation (Caltrans) District 4
Approving Agency Role
Lead Agency
Approved On
County Clerk
Napa
Final Environmental Document Available at
https://dot.ca.gov/caltrans-near-me/district-4/d4-popular-links/d4-environmental-docs
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.