2021-7280 2021-7281 480,490 S Mathilda 355 W Olive Office Project

3 Documents in Project

Summary

SCH Number
2022060057
Lead Agency
City of Sunnyvale
Document Title
2021-7280 2021-7281 480,490 S Mathilda 355 W Olive Office Project
Document Type
NOD - Notice of Determination
Received
Posted
8/18/2022
Document Description
An NOD for a DEVELOPMENT AGREEMENT (DA): Introduction of an Ordinance Approving and Adopting of a DA between the City of Sunnyvale and Gary Thon-Lon Hon and Nichole Ying Lin Hon, as trustees of the Hon Family Trust and Edward H. Leone Jr. LLC. and a SPECIAL DEVELOPMENT PERMIT (SDP): to demolish the existing buildings and construct a new 125,128 square foot four (4) story office building with two (2) levels of underground parking.

Contact Information

Name
Shaunn Mendrin
Agency Name
City of Sunnyvale
Job Title
Planning Officer
Contact Types
Lead/Public Agency

Location

Cities
Sunnyvale
Counties
Santa Clara
Regions
Citywide, Countywide
Cross Streets
S. Mathilda, W Olive, S Taaffe, W Iowa
Zip
94086
Total Acres
1.3
Parcel #
209-28-008, 209-28-052
Other Location Info
The project site consists of two parcels containing a commercial building and a two-story office building. The existing commercial building at the corner of Mathilda and Olive was constructed in 1976 as an office building, used as a financial institution and since 2007 as a retail store; it is approximately 7,201 square feet in size. The two-story office building on Olive was constructed in 1961 and provides multi-tenant small office spaces; it is 13,543 square feet. Together, the two buildings total 20,744 square feet. There have only been minor permits issued for either site and/or building maintenance. There is minimal existing landscaping on either property; mature trees are located on the Olive (south) side of the older building.
Other Information
The parcels are located in Block 13 of the DSP and the two parcels are designated with a total of 47,660 square feet of office and 5,683 square feet of commercial space. The DSP was amended in August of 2020 which included changes that allowed proposed development to exceed the designated square footages through Community Benefits and a Development Agreement. The proposed project includes demolition of the existing structures and the construction of a new 125,128 square foot, four-story mass timber office building with two levels of underground parking. The exterior of the building will be cladded with a glass curtain system on three sides of the building with extruded bay window elements used to add interest on the façades. The east façade, which faces single-family homes, would also have a curtain wall with wood cladding and smaller window openings. The pedestrian entrance would be located at the corner of S. Mathilda Avenue and W. Olive Avenue and would be enhanced with an exposed exterior stairwell and vertical supports for an arbor element above the fourth floor. Vehicle access to the underground parking garage would be via a driveway located on W. Olive Avenue. The rooftop would include open space for tenants of the building, landscaping, covered arbor area and space for mechanical equipment. The site would be landscaped and would include new sidewalks, driveway access, and other plantings

Notice of Determination

Approving Agency
City of Sunnyvale
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
https://www.sunyvale.ca.gov/business-and-development/planning-and-building/ceqa-environmental-notices

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print