State Route 154 Drainage Rehabilitation Project

4 Documents in Project

Summary

SCH Number
2022050438
Lead Agency
California Department of Transportation, District 5 (DOT)
Document Title
State Route 154 Drainage Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
4/6/2023
Document Description
Caltrans plans to rehabilitate existing drainage systems on State Route 154 in Santa Barbara County from post miles 0.0 to 32.84. The project will also rehabilitate the Rancho Cielo (Cold Spring) Vista Point and install traffic census systems. Project activities will involve vegetation clearing, site restoration, temporary construction access, temporary construction staging sites, temporary traffic control, pavement repaving, and pavement re-stripping.

Contact Information

Name
Geramaldi Geramaldi
Agency Name
CA DEPT. OF TRANSPORTATION
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency

Location

Cities
LOS OLIVOS, SANTA YNEZ, Santa Barbara
Counties
Santa Barbara
Regions
Countywide, Unincorporated
State Highways
154, 246, 101
Airports
SANTA YNEZ GENERAL AVIATION
Schools
LOS OLIVOS ELEMENTARY, DUNN PRIVATE, SANTA YNEZ VALLEY CHARTER,
Waterways
SANTA YNEZ RIVER, SAN LUCAS CREEK, LAKE CACHUMA
Other Location Info
The project begins in the north near the intersection of State Route 154 and U.S. Route 101, near Los Olivos. The project ends in the south near the intersection of State Route 154 and U.S. Route 101 in Santa Barbara.
Other Information
The project is approximately 33 miles long and lies entirely along State Route 154

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print