Woodlake Holdings Industrial Park Project

4 Documents in Project

Summary

SCH Number
2022040640
Lead Agency
City of Woodlake
Document Title
Woodlake Holdings Industrial Park Project
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Zone - Industrial, GPLU - Urban Reserve and Industrial, Land Use - Industrial
Document Description
The Project Applicant intends to expand an existing industrial area by developing a 113-acre industrial center that will house various industrial uses allowable by the zone district, including cannabis cultivation, manufacturing, distribution and retail, which is allowable with a Conditional Use Permit. Project Components • Constructing and operating an industrial park with seventeen buildings ranging in size of 75,000 sf to 87,000 sf for a total of up to 1,500,000 sf of industrial space. • Constructing internal access roads, 700 parking spaces and associated landscaping • Connecting the Project to the existing City water and wastewater systems. Any grow operations will utilize the existing well connection for water. • Installation of perimeter security, including lighting and an alarm system, in accordance with Chapter 5.48 of the Woodlake Municipal Code. • Constructing three new ponding basins of 7.93 Ac ft, 8.42 Ac ft, and 16.42 Ac ft. Construction will begin in 2022 and will continue to buildout as the market demands. Project Operations The site will operate from 7am to 6pm Monday through Friday. The facility’s electrical needs will continue to be serviced by existing Southern California Edison connections that have been assessed as sufficient for full operation of allowable industrial uses, including indoor/mixed light cannabis cultivation. Once a business is established, water needs for the grow houses will be serviced by existing deep-water wells while water needs for the distribution facilities and sanitary facilities will be provided by the City. Stormwater will be kept on-site, and wastewater will be connected to the City’s existing system. To accommodate this Project, the following entitlements are required: • Conditional Use Permit to operate under a Cannabis Business License (Cultivation, Manufacturing, Retail and Distribution) for cannabis businesses • General Plan Amendment to change the land use designation of APNs 060-160-044 and -059 from Urban Reserve to Industrial • Lot line adjustment as per the City’s requirements • Tentative Parcel Map to divide the existing parcel into 21 separate parcels

Contact Information

Name
Rebecca Griswold
Agency Name
City of Woodlake
Job Title
Community Services Director
Contact Types
Lead/Public Agency

Location

Cities
Woodlake
Counties
Tulare
Regions
Citywide, Countywide
Cross Streets
Blair Road and Ropes Avenue
Zip
93286
Total Acres
113
Jobs
20
State Highways
216, 245

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Cannabis Control (DCC), California Department of Fish and Wildlife, Cannabis Program (CDFW), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Parks and Recreation, California Department of Pesticide Regulation (DPR), California Department of Resources Recycling and Recovery, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 6 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Natural Resources Agency, California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), California State Lands Commission (SLC), Department of Food and Agriculture (CDFA), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, California Native American Heritage Commission (NAHC), California Department of Conservation (DOC)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), California Department of Conservation (DOC)
Development Types
Industrial (Sq. Ft. 1500000, Acres 113, Employees 20)
Local Actions
General Plan Amendment, Use Permit
Project Issues
Agriculture and Forestry Resources, Air Quality, Energy, Greenhouse Gas Emissions, Transportation
Local Review Period Start
Local Review Period End

Attachments

Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print