Blythe Avenue Recharge Basin

2 Documents in Project

Summary

SCH Number
2022040362
Lead Agency
Riverdale Irrigation District
Document Title
Blythe Avenue Recharge Basin
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2022
Document Description
Project Description The Proposed Project involves one phase of construction including two groundwater recharge basin facilities. The recharge water will be recovered in dry years, for use in the District efforts to achieve groundwater sustainability. Basins Construction of the project will include equipment mobilization, excavation of earthwork for recharge basins, and construction of basin perimeter berms at both sites. Project components could include constructing ponds/cells within the two separate basins, as well as performance testing and demobilization. Depth of cut is estimated to be in the range of 3 to 6 feet, with an estimated volume of 100,000 cubic yards of material, which will be excavated and compacted on site. New berm construction would not exceed six feet in height, measured from the exterior toe to the top of new berm. The Project will also require modification or replacement of existing structures and a flow measurement standpipe structure. Pipelines There are two tie-in locations to the existing Turner Ditch canal. One proposed 500-foot-long pipeline will connect the southern property to the canal. Additionally, a 50-foot pipeline will connect the northern property. Diameter of the pipelines will be 60 inches or less. Turnouts The proposed project will include two turnouts with capacity for 35 cfs. The project will also include a proposed flow measurement standpipe structure.

Contact Information

Name
Kim Mayfield
Agency Name
Riverdale Irrigation District
Job Title
Secretary
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Riverdale - CDP
Counties
Fresno
Regions
Unincorporated
Cross Streets
W Mount Whitney Avenue and S Blythe Avenue
Zip
93656
Total Acres
25
Waterways
Turner Ditch
Township
17S
Range
19E
Section
22/23
Base
MDB&M

Notice of Determination

Approving Agency
Riverdale Irrigation District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Fresno
Final Environmental Document Available at
Riverdale Irrigation District, 21027 S. Brawley Ave, Riverdale, CA 93656

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print