Patton State Hospital Waterline Replacement Project
2 Documents in Project
Summary
SCH Number
2022030787
Lead Agency
California Department of State Hospitals
(DSH)
Document Title
Patton State Hospital Waterline Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/14/2022
Document Description
Patton State Hospital proposes to replace an existing 14-inch diameter, 115-foot-long waterline due to leakage. The new 16-inch diameter waterline would extend approximately 165 feet and be installed from two existing reduced pressure double detector check and pressure reducing valve assemblies. The abandoned waterline would be filled with grout. Construction of the Proposed Project is estimated to begin in Spring of 2023 and last approximately 13 months.
Contact Information
Name
Robert Horsley
Agency Name
California Department of State Hospitals
Job Title
Chief Operating Office (Acting)
Contact Types
Lead/Public Agency / Project Applicant
Phone
Location
Coordinates
Cities
San Bernardino
Counties
San Bernardino
Regions
Citywide
Cross Streets
3102 Highland Avenue
Zip
92369
Total Acres
243
Parcel #
0285-191-10
State Highways
330 and 210
Schools
Cole Elementary, Cypress Elementary, Emmerton Elementary
Waterways
Sand Creek
Township
1N
Range
29W
Section
29
Notice of Determination
Approving Agency
California Department of State Hospitals
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
http://bit.ly/DGSCEQA
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.