Patton State Hospital Waterline Replacement Project

2 Documents in Project

Summary

SCH Number
2022030787
Lead Agency
California Department of State Hospitals (DSH)
Document Title
Patton State Hospital Waterline Replacement Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Land Use: PQP (Public/Quasi Public); Zoning: PF (Public Facility)
Document Description
Patton State Hospital proposes to replace an existing 14-inch diameter, 115-foot-long waterline due to leakage. The waterline replacement would take place in the northeast one-third of the hospital where a solar field, a collection of multiple solar panels that generate electricity as a system, currently exists. The existing waterline is located just north of the eastern portion of the solar field and runs diagonally across the western portion of the solar field. The new 16-inch diameter waterline would extend approximately 165 feet and be installed from two existing reduced pressure double detector check (DDCV) and CLA-VAL pressure reducing valve assemblies. The new waterline would need to cross the southern portion of an existing, non-jurisdictional north/south drainage located in between the solar field. The Project would also replace one high flow DDCV assembly with a 3-inch low flow assembly to stabilize water system pressure swings. The Project also involves improvements to the West and East Loop pressure reducing valve (PRV) stations to help stabilize the water system pressure swings. The new waterline would be buried in a new approximately 5 to 6-foot-deep trench beginning at the west side of Orange Avenue and extending west to the facility water system manifold. Fencing, concrete, and asphalt along the new water line alignment would be removed and replaced as needed. The new pipe would be covered with sand and the trenching would be backfilled with compacted soil (some of the topsoil would not be used as its typically organic material; not suitable for backfill). Ground disturbing activities would consist of less than 0.5 acre. During construction, the existing 14-inch waterline would remain in service and would be disconnected and abandoned in place once the new water line is installed. The abandoned waterline would be filled with grout. During the connection process, the water system would be shut down. It is anticipated that this shutdown would be less than four hours. Construction of the Proposed Project is estimated to begin in Spring of 2023 and last approximately 13 months. It is estimated that one crew of 4 to 8 people would be responsible for working on pipe fittings and installations while another crew of 4 to 8 would be responsible for excavating the trench for the waterline to be placed. An existing contractor lay down area and dumpster area located southwest of the solar field would be used during construction of the Proposed Project.

Contact Information

Name
Chris Lehner
Agency Name
California Department of State Hospitals
Job Title
Associate Construction Analyst
Contact Types
Lead/Public Agency

Name
Freddie Olmos
Agency Name
ECORP Consulting, Inc.
Job Title
Principal Environmental Planner
Contact Types
Consulting Firm

Location

Cities
San Bernardino
Counties
San Bernardino
Regions
Citywide
Cross Streets
3102 Highland Avenue
Zip
92369
Total Acres
243
Parcel #
0285-191-10
State Highways
330 and 210
Schools
Cole Elementary, Cypress Elementary, Emmerton Elementary
Waterways
Sand Creek
Township
1N
Range
29W
Section
29

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Transportation, District 8 (DOT), California Department of Water Resources (DWR), California Energy Commission, California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Office of Statewide Health Planning and Development (OSHPD), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Other (Waterline Replacement)
Local Actions
Waterline Replacement
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Local Review Period Start
Local Review Period End

Attachments

Download CSV Download All Attachments New Search Print