Digital-First Element Fuel Station

Summary

SCH Number
2022030651
Lead Agency
City of San Diego
Document Title
Digital-First Element Fuel Station
Document Type
NOD - Notice of Determination
Received
Posted
3/23/2022
Document Description
The project proposes an Amendment to a Conditional Use Permit (CUP) for the installation of hydrogen equipment and two hydrogen fueling dispensers at an existing service station and convenience store, on a 0.47- acre site, The project also proposes regrading ofth1;1 existing pavement, reconstruction of ail existing driveways, and new landscaping. Furthermore, as a condition of approval the closure of the non-utilized portions of existing driveways with current city standard curb, gutter and sidewalk would be required. The project proposes a concrete masonry unit (CMU) enclosure for the hydrogen equipment that would be approximately 35 foot in length, 18.5 feet In width and 15 feet high. he existing building and service station would remain. The service station would continue to operate from 6:00 a.m. to 12:00 pm., seven days a week. The project proposes the removal of two parking spaces along the northeastern perimeter of the site to accommodate the proposed hydrogen equipment. The project would provide a total of 6 spaces, including one existing American Disability Act (ADA) parking space.

Contact Information

Name
Rhonda Benally
Agency Name
City of San Diego
Job Title
Planner
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Regions
Citywide
Other Information
Conditional Use Permit

Notice of Determination

Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
Development Services Department, 1222 First Avenue, San Diego, CA 92101

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (An Addendum to Negative Declaration No. 88-0072)
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print