Pioneer Trail Pipeline and Pump Station

2 Documents in Project

Summary

SCH Number
2022030428
Lead Agency
Truckee Donner Public Utility District
Document Title
Pioneer Trail Pipeline and Pump Station
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2022
Document Description
The Truckee Donner Public Utility District proposes construction of a I .7-mile pipeline corridor along the Pioneer Trail alignment between Northwoods Blvd and Comstock Dr. The pipeline corridor would supply water, electrical, and communication utilities to the Truckee Donner subdivision. The pipeline corridor would primarily be constructed along the existing Pioneer Trail and dirt utility roads. A pump station would be sited on the eastern end of the pipeline corridor on District-owned property.

Contact Information

Name
Shanna Kuhlemier
Agency Name
Truckee Donner Public Utility District
Job Title
District Clerk
Contact Types
Lead/Public Agency

Location

Regions
Northern California
Zip
96162
Other Information
Truckee Donner Public Utility District (District) proposes to construct and operation of a single pump station and an approximately 1.7-mile-long pipeline alignment between Northwoods Boulevard and the intersection of Pioneer Trail and Comstock Drive in the Town of Truckee. The project study area included land approximately 25-feet either side of the proposed pipeline alignment. The proposed project includes a 6 foot-wide and 6-foot-deep excavated trench within the pipeline alignment. During construction, approximately 20-feet on either side of the excavated trench may be temporarily disturbed by construction equipment and materials staging. Following construction, erosion controls measures and limited revegetation would be implemented, as needed, to assist in the rehabilitation of the disturbed construction area.

Notice of Determination

Approving Agency
Truckee Donner Public Utility District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Nevada
Final Environmental Document Available at
www.tdpud.org

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print