North Bayshore Master Plan Project (DA)

5 Documents in Project

Summary

SCH Number
2022020712
Lead Agency
City of Mountain View
Document Title
North Bayshore Master Plan Project (DA)
Document Type
NOD - Notice of Determination
Received
Posted
6/29/2023
Document Description
The project is the approval of a Development Agreement (DA) over a 30-year period to allow development implementation of the North Bayshore Master Plan, which would allow for the demolition of 68 of the existing 69 buildings (as well as removal of related surface parking lots and landscaping) to construct: • Up to 7,000 residential dwelling units (including 15 percent affordable residential units); • Up to 3,117,931 million square feet of office space (including 1,303,250 square feet of net new office space and 1,814,681 square feet of existing office space to be redeveloped); • 14.8 acres of public open space and 11.3 acres of Privately Owned Publicly Accessible (POPA) open space; • 233,990 square feet of retail uses; • Up to of 55,000 square feet of community facilities; • Up to 525 hotel rooms; • A 2,000 square foot Police Operations Station; • Up to six above-ground parking structures; and • As an option, a private district utility system with an approximately 130,000 square-foot District Central Plant DCP and underground distribution/collection lines to serve the buildings within the Master Plan with thermal energy (heating and cooling), electric power via a microgrid, and/or pneumatic waste collection and an option for wastewater and recycled water based upon City concurrence. Implementation of the Master Plan would require the removal of existing trees, including Heritage Trees. The proposed project would plant replacement trees in conformance with the City requirements. The maximum building heights would range from approximately 45 to 160 feet (with certain building elements to exceed the maximum specified height in the Precise Plan, per a variance application). The project would also include back-up power systems to facilitate fire and life safety loads in an emergency, in addition to diesel-powered emergency generators at each building. Parking within the Master Plan area would be provided in surface, podium, and/or below ground parking facilities, as well as within three additional district parking garages. One of the district parking garages is proposed to be constructed on the City-owned Lot C (APN 116-20-043). The Master Plan includes a Vesting Tentative Map and a Development Agreement to vest the Master Plan’s development rights over a 30-year period. The Vesting Tentative Map will create 58 new parcels, including 27 parcels for residential buildings with up to 7,000 residential condominium units, 360 commercial condominium units, and 526 vertical subdivision lot within the Master Plan area. The primary components of the Master Plan include the following: • Master Plan Subareas • Parks and Open Space • Utilities (including an option for private district utility systems) • Emergency Generators • Green Building and Emissions Reduction Features • Construction Activities and Phasing • Site Access, Circulation, and Parking • Transportation Demand Management • Heritage Trees and Landscaping The Vesting Tentative Map, North Bayshore Master Plan, vacation of public street and service easements, and option to lease Lot C were previously approved by the City on June 13, 2023 and a Notice of Determination for those approvals was posted on June 15, 2023

Contact Information

Name
Diana Pancholi
Agency Name
City of Mountain View
Job Title
Principal Planner
Contact Types
Lead/Public Agency

Location

Cities
Mountain View
Counties
Santa Clara
Regions
Citywide, Countywide, San Francisco Bay Area
Cross Streets
Shoreline Blvd/Space Park Way, Shoreline Blvd/Plymouth St, Huff Ave/Charleston Rd, Shoreline Blv
Zip
94043
Total Acres
153
Parcel #
116-10-108, 116-10-107, 116-10-105, 116-10-104, 116-10-102, 116-10-101, 116-10-111, 116-10-095,
State Highways
SR 85, SR 82, SR 237
Railways
Caltrain, VTA light rail
Airports
Moffett Federal Airfield
Schools
Crittenden, Monta Loma, Stevenson
Waterways
Stevens Creek, Permanente Creek, Adobe Creek, Barron Creek
Township
6S
Range
2W
Section
10

Notice of Determination

Approving Agency
City of Mountain View City Council
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
City of Mountain View Planning Division. 500 Castro Street, Mountain View, CA 94041

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.