Lee Vining Rehab

4 Documents in Project

Summary

SCH Number
2022020127
Lead Agency
California Department of Transportation, District 9 (DOT)
Document Title
Lee Vining Rehab
Document Type
NOD - Notice of Determination
Received
Posted
4/8/2022
Document Description
The Department of Transportation (Caltrans) proposes to pulverize or cold plane the entire pavement area, replace all drainage, sidewalks, and guardrail from postmiles 50.6 to 53.1. Shoulder backing (three feet in width) will be placed where there is no sidewalk adjacent to U.S. Route 395. In addition, conceptual cross-section design options have been prepared for postmiles 51.2 to 51.7 (within the community of Lee Vining. Drainage facilities are proposed outside of existing Caltrans right of way, including culverts and detention basins on the east side of Lee Vining. The final location and size of the proposed culverts and detention basins have not been determined at this date. The detention basins will require excavation to approximately ten feet deep. An additional drainage design option is being considered which would construct an approximately twenty-foot wide bioswale inside Caltrans R/W in front of the Caltrans HMS, Mono County HMS, and Lee Vining High School parcels.

Contact Information

Name
Ryan Spaulding
Agency Name
Caltrans District 9
Job Title
Associate Environmental Planner
Contact Types
Lead/Public Agency

Location

Cities
Lee Vining
Counties
Mono
Regions
Countywide
Zip
93541
State Highways
U.S. Route 395
Other Location Info
U.S. Route 395, postmiles 50.60 to 53.10, near the community of Lee Vining (Mono County).

Notice of Determination

Approving Agency
Caltrans District 9
Approving Agency Role
Lead Agency
Approved On
County Clerk
Mono
Final Environmental Document Available at
Caltrans District 9 office, 500 South Main Street, Bishop, CA 93514

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print