South Mokelumne River Setback Levee Project

2 Documents in Project

Summary

SCH Number
2022010311
Lead Agency
Reclamation District 348
Document Title
South Mokelumne River Setback Levee Project
Document Type
NOD - Notice of Determination
Received
Posted
4/26/2022
Document Description
Portions of the New Hope Tract levee system, along the South Mokelumne River, are below the Delta Specific PL 84-99 Standard, which requires 1.5 feet of freeboard above the 100-year flood elevation, waterside slopes at a minimum of 2:1 and landside slopes at a minimum of 3:1. The purpose of the South Mokelumne River Setback Levee Project is to rehabilitate 3 levee sections, totaling 4,350 LF, and to create waterside habitat. Landside work includes constructing setback levees to the Delta Specific PL 84-99 Standard. Aggregate base material will be placed on the setback levee crown to create an all-weather roadway. Waterside work includes excavation of the existing levee above Mean Lower Low Water (MLLW) to construct a habitat bench. The habitat benches and setback levee waterside slopes will be planted with native species. Plantings will be monitored and maintained for 3 years to ensure success criteria is met.

Contact Information

Name
Alexis Stevens
Agency Name
Reclamation District No. 348
Job Title
Secretary
Contact Types
Lead/Public Agency

Location

Counties
San Joaquin
Regions
Unincorporated
Cross Streets
North Lamb Road and West Walnut Grove Road
Zip
95242
Total Acres
16
Parcel #
001-050-100, -250, -280
Waterways
South Mokelumne River
Township
4N
Range
4E, 5E
Base
MDBM

Notice of Determination

Approving Agency
Reclamation District No. 348
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
500 Capitol Mall, Suite 1000, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print