Big Bear High School Football and Track Stadium Project
3 Documents in Project
Summary
SCH Number
2021120651
Lead Agency
Bear Valley Unified School District
(BVUSD)
Document Title
Big Bear High School Football and Track Stadium Project
Document Type
NOD - Notice of Determination
Received
Posted
2/25/2022
Document Description
The proposed Big Bear High School Football and Track Stadium Project consists of development of a football and track stadium within a ~7-acre site designated for Public Facility (PF) use by the San Bernardino Countywide Plan on the northwest corner of Maple Lane and Baldwin Lane in the Unincorporated Community of Sugarloaf. The project consists of one parcel with the following Assessor’s Parcel Numbers (APN): 0312-311-20.
The project would be installed within the previously occupied Chautauqua High School, and proposes to demolish the existing structures on site, and develop the site as a continuation of the Big Bear High School athletic fields with a new football and track stadium to serve the High School and District athletics. On the western edge of the site, the project proposes to install a home team grandstand with a 750± seating capacity. On the eastern edge of the site, the project proposes to install a visiting team grandstand with a 250 ± seating capacity. The project proposes to install field lighting illuminating to 50 footcandles on either side of the home and visiting team grandstands, with lighting directed towards the fields, shielded to the greatest extent possible from the nearby residential community to the south of the project site. At the southern end of the site toward Baldwin Lane, the project proposes to install a north facing scoreboard. The proposed project will be accessible via new driveways at Baldwin Lane and Maple Lane, which connect to a parking lot that provides entrance/exit at either access point. The parking provided at the site will be limited to handicapped (ADA) parking, and a designated drop-off zone, with the remainder of the required parking for the Stadium already provided at the existing High School to the north of the project site.
Contact Information
Name
Terry Planz
Agency Name
Bear Valley Unified School District
Job Title
Director of Maintenance & Operations
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Bernardino
Regions
Southern California
Cross Streets
intersection of Maple Lane and Baldwin Lane
Zip
92315
Total Acres
~7 acres
Parcel #
0312-311-20
State Highways
SR-38 SR-18
Railways
N/A
Airports
Big Bear Airport
Schools
BBHS / Baldwin Elementary
Waterways
N/A
Township
2N
Range
1E
Section
13
Base
SBBM
Notice of Determination
Approving Agency
Bear Valley Unified School District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
Bear Valley Unified School District office at 42271 Moonridge Road, Big Bear Lake, CA 92315
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.