Middlefield Park Master Plan Project

5 Documents in Project

Summary

SCH Number
2021100026
Lead Agency
City of Mountain View
Document Title
Middlefield Park Master Plan Project
Document Type
NOD - Notice of Determination
Received
Posted
11/18/2022
Document Description
The project would implement a large portion of the development envisioned by the East Whisman Precise Plan, which was adopted by the City in 2019. Implementation of the proposed project would allow for the demolition of the existing improvements (i.e., approximately 684,646 square feet of office uses, related surface parking areas, and landscaping) on-site and development of: Five office building locations totaling 1,317,000 square feet of office uses and resulting in 632,355 square feet of net new office square footage; Two affordable residential building locations and five residential mixed-use building locations with a total of up to 1,900 residential units (including up to 380 affordable units), up to 30,000 square feet of ground floor retail space, and 20,000 square feet of community/civic uses; Two stand-alone parking structures and integrated parking at all office and residential buildings for shared district parking within MPMP; Dedication of land to the City for three new future public parks totaling approximately 7.28-acres and construction of a 2.87-acre privately owned and publicly accessible park developed by the applicant, providing in total, up to 10.15 acres of park open space within the MPMP; New vehicular circulation, including up to six private streets and a modification to Logue Avenue (a public street), new on-street and off-street bicycle and pedestrian improvements, and new landscaping and trees; and As an option, the project could include a private district utilities system on-site with underground utility lines to serve some buildings within the MPMP with water, wastewater treatment, recycled water, geothermal energy (heating and cooling), and electric power. The private district utilities system, if provided, would include an approximately 45,000-square-foot Central Utility Plant (CUP) temporary air sourced heat pump, district distribution system, and microgrid system that would include rooftop photovoltaic panels and on-site storage batteries. In addition to the improvements identified above, the project includes a Vesting Tentative Map to create up to 18 lots, up to 1,900 condominium lots and up to 140 vertical lots within the MPMP. Other aspects of the MPMP include green building and emissions reduction features; construction activities; heritage tree removals and landscaping; site access, circulation, and parking; and a Transportation Demand Management (TDM) plan.

Contact Information

Name
Lindsay Hagan
Agency Name
City of Mountain View
Job Title
Assistant Community Development Director
Contact Types
Lead/Public Agency

Location

Cities
Mountain View
Counties
Santa Clara
Regions
Citywide, Countywide, San Francisco Bay Area
Cross Streets
Middlefield Road/Ellis Street and Logue Avenue/Maude Avenue

Notice of Determination

Approving Agency
City of Mountain View City Council
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
City of Mountain View Planning Division, 500 Castro Street, Mountain View, CA 94041

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.