Middlefield Park Master Plan Project Final EIR

5 Documents in Project

Summary

SCH Number
2021100026
Lead Agency
City of Mountain View
Document Title
Middlefield Park Master Plan Project Final EIR
Document Type
FIN - Final Document
Received
Present Land Use
P-41, East Whisman Mixed Use/High Intensity Office
Document Description
Project Description: The project would implement a large portion of the development envisioned by the East Whisman Precise Plan, which was adopted by the City in 2019. Implementation of the proposed project would allow for the demolition of the existing improvements (i.e., approximately 684,646 square feet of office uses, related surface parking areas, and landscaping) on-site and development of: •Five office building locations totaling 1,317,000 square feet of office uses and resulting in 632,355 square feet of net new office square footage;•Two affordable residential building locations and five residential mixed-use building locations with a total of up to 1,900 residential units (including up to 380 affordable units), up to 50,000 square feet of ground floor retail space;•Two stand-alone parking structures and integrated parking at all office and residential buildings for shared district parking within MPMP;•Dedication of land to the City for three new future public parks totaling approximately 7.28-acres and construction of a 2.87-acre privately owned and publicly accessible park developed by the applicant, providing in total, up to 10.15 acres of park open space within the MPMP;•New vehicular circulation, including up to six private streets and a modification to Logue Avenue (a public street), new on-street and off-street bicycle and pedestrian improvements, and new landscaping and trees; and•As an option, the project could include a private district utilities system on-site with underground utility lines to serve some buildings within the MPMP with water, wastewater treatment, recycled water, geothermal energy (heating and cooling), and electric power. The private district utilities system, if provided, would a include an approximately 45,000-square-foot Central Utility Plant (CUP), temporary air sourced heat pump, district distribution system, and microgrid system that would include rooftop photovoltaic panels and on-site storage batteries. In addition to the improvements identified above, the project includes a Vesting Tentative Map to create up to 18 lots, up to 1,900 condominium lots, and up to 140 vertical lots within the MPMP, as well as a Development Agreement to grant implementation of entitlements over a 20-year period. Other aspects of the MPMP include green building and emissions reduction features; construction activities; heritage tree removals and landscaping; site access, circulation, and parking; and a Transportation Demand Management (TDM) plan.

Contact Information

Name
Lindsay Hagan
Agency Name
City of Mountain View
Job Title
Deputy Zoning Administrator
Contact Types
Lead/Public Agency

Location

Cities
Mountain View
Counties
Santa Clara
Regions
San Francisco Bay Area
Cross Streets
Middlefield Road/Ellis Street and Logue Avenue/Maude Avenue
Zip
94043
Total Acres
40
State Highways
SR 237 and HWY 85 US 101
Railways
VTA
Airports
Moffett Federal Airfield
Schools
Jose Antonio Vargas Elementary

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Housing and Community Development (HCD), California Department of Parks and Recreation, California Department of Resources Recycling and Recovery, California Department of Transportation, District 4 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Energy Commission, California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Office of Historic Preservation, San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 17, State Water Resources Control Board, Division of Water Quality
Development Types
Residential (Units 1900, Acres 40), Office (Sq. Ft. 1317000, Acres 40, Employees 1000), Commercial (Sq. Ft. 50000, Acres 40, Employees 500), Recreational (10.15 Acres), Transportation:Other (Bike and Pedestrian Improvements), Power:Other Power Type (Microgrid/photovoltaic)(Megawatts 7200), Waste Treatment:Other (Wastewater treatment Plant)(MGD 0.25)
Local Actions
Master Plan, Planned Unit Development, Use Permit, Land Division (Subdivision, etc.), Redevelopment
Project Issues
Air Quality, Cumulative Effects
Local Review Period Start
Local Review Period End

Attachments

Final Document(s) [Approved_Certified draft environmental documents]
Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print