Chiles Pope Bridge Replacement (Notification of Lake or Streambed Alteration, No. EPIMS-NAP- 30757-R3) Amendment

4 Documents in Project

Summary

SCH Number
2021090076
Lead Agency
Napa County
Document Title
Chiles Pope Bridge Replacement (Notification of Lake or Streambed Alteration, No. EPIMS-NAP- 30757-R3) Amendment
Document Type
NOD - Notice of Determination
Received
Posted
4/3/2024
Document Description
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-NAP-30757-R3, pursuant to Section 1602 of the Fish and Game Code to the County of Napa. The Project is limited to the replacement of an existing bridge structure. The new bridge will be longer than the existing bridge in order to widen the creek channel and eliminate constriction posed by the existing bridge. The new bridge structure will consist of an approximately 105-foot-long by 26-foot-wide two-span cast-in-place prestressed concrete slab bridge that is two feet in depth. Two new abutments will be installed. Abutments will consist of a seat type abutment cap beam supported on soldier piles with ground anchors. One bent will be installed in the center of the channel to support the bridge, consisting of four 3-foot cast-in-place-drilled-hole shaft extensions. The Project will also install four new retaining walls. Pile installation for the retaining walls and abutments will be performed from the roadway. Excavation and installation of three retaining walls, abutment facing, and bent will be constructed from within the creek. A 30-foot-wide temporary access road into the creek will be created by grading the roadway approach and creek bank upstream of the existing bridge. A temporary stream diversion will be installed with cranes operated from the road and consist of an upstream cofferdam consisting of rock slope protection and sandbags, directing flow into two 24-inch diameter culverts that will extend 400 linear feet. The Project will result in temporary impacts to 0.22 acres and 450 linear feet of stream and riparian habitat from the temporary diversion of water and the installation of the temporary access road into the creek. The Project will result in permanent impacts to 239 square feet and 231 linear feet of stream and riparian habitat and will remove 24 riparian trees. This major amendment allow certain Project activities covered under the Agreement to commence before the Agreement Work Period start date of June 1 in order for the Project to be completed in one construction season. The Project activities covered under the major amendment are limited to mobilizing equipment, deploying protective measures and Best Management Practices, installing Abutment 1 and Abutment 3 (portion) and retaining wall 3 (portion), and installing soldier h-piles outside of the streambed and riparian area within the paved section and road shoulder of the Chiles Pope Valley Road bridge above Chiles Creek.

Contact Information

Name
Nicholas Magnuson
Agency Name
CA Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Napa
Regions
San Francisco Bay Area
Other Location Info
The Project is located at Chiles Creek, a tributary to Lake Hennessey, and an unnamed tributary of Chiles Creek, along Chiles Pope Valley Road, in the County of Napa, State of California; Latitude 38.519085°N, Longitude 122.349143°W; Assessor’s Parcel Numbers: 025-440-003-000, 025-440-002-000, and 025-440-047-000.

Notice of Determination

Approving Agency
CA Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Napa
Final Environmental Document Available at
The Mitigated Negative Declaration prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.