Mission Bay School Project

4 Documents in Project

Summary

SCH Number
2021050349
Lead Agency
San Francisco Unified School District
Document Title
Mission Bay School Project
Document Type
EIR - Draft EIR
Received
Present Land Use
Planning Code: Mission Bay Redevelopment Area (MB RA) and MB-RA height and bulk district; Redevelopment Plan for the Mission Bay South Redevelopment Project: Mission Bay Community Facilities (MB-CF) and zoned HZ-9
Document Description
The District proposes demolition of a surface parking lot and construction of a new school in the Mission Bay neighborhood of the City of San Francisco. The project would include construction of a multistory (maximum of 63 feet tall), up to 105,700-square-foot school. The proposed facility would include a preschool, transitional kindergarten, kindergarten-through-fifth grade elementary school, linked learning hub, professional learning space, outdoor learning area, outdoor play area, and paved surface parking lot. Demolition and surcharging at the project site would begin in approximately March 2022. There would be an approximate one-year period when no construction activity would occur (i.e., mid-2022 to mid-2023). Site remediation and construction of the proposed building would begin in mid-2023 and continue for approximately 21 to 24 months. Construction would conclude by summer 2025, and the project would be fully operational in 2025. As the design of the project progresses, it may be determined that surcharging is not required for the proposed project.

Contact Information

Name
Jessica Viramontes
Agency Name
ICF
Contact Types
Consulting Firm

Name
Sarah Price
Agency Name
San Francisco Unified School District
Contact Types
Lead/Public Agency

Location

Cities
San Francisco
Counties
San Francisco
Cross Streets
Mission Bay Boulevard, Sixth Street, Nelson Rising Lane, Owens Street
Zip
94158
Total Acres
2.45
Parcel #
Block 8709, lot 011; block 8711, lot 007
State Highways
I-280, I-80, US-101
Railways
Caltrain
Airports
N/A
Schools
Live Oak, Bessie Carmichael, Daniel Webster, SF International HS
Waterways
Mission Creek Channel, San Francisco Bay
Township
02S
Range
05W
Base
Diablo

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Education, California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Department of General Services (DGS), Department of Toxic Substances Control, Office of Historic Preservation, San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality
Development Types
Educational (up to 105,700 sf)
Local Actions
property title transfer, approval of design, approval of RAW
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Vegetation, Wetland/Riparian, Wildfire

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print