Narrows 2 Intake Debris Removal Project
3 Documents in Project
Summary
SCH Number
2021050154
Lead Agency
Yuba County Water Agency
Document Title
Narrows 2 Intake Debris Removal Project
Document Type
NOD - Notice of Determination
Received
Posted
6/22/2021
Document Description
The Project involves dredging to remove debris that has accumulated around the Narrows 2 Powerhouse Intake in Englebright Lake. The dredging operation would be conducted by an excavator or crane staged from the existing nearby gravel access road or Narrows 2 Intake Platform. Dredging would remove approximately ±175 cubic yards of woody debris. Dredged debris would be loaded into trucks and transferred to two graveled flat storage areas on top of a nearby hill for dewatering and drying prior to being piled and burned on-site pursuant to a non-agricultural burn permit issued by Feather River Air Quality Management District (FRAQMD), or disposed of at the Recology Ostrom Road Landfill in Wheatland, CA.
Contact Information
Name
Jacob Vander Meulen
Agency Name
Yuba County Water Agency
Contact Types
Lead/Public Agency / Project Applicant
Phone
Location
Counties
Yuba
Regions
Citywide, Countywide
Other Location Info
Narrows 2 Powerhouse Intake at the south end of Harry L. Englebright Lake, Yuba County
Notice of Determination
Approving Agency
Yuba County Water Agency
Approving Agency Role
Lead Agency
Approved On
County Clerk
Yuba
Final Environmental Document Available at
https://www.yubawater.org/326/Public-Notices
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.