Paradise Irrigation District Water System Recovery and Reservoir B Replacement Project
4 Documents in Project
Summary
SCH Number
2021040273
Lead Agency
Paradise Irrigation District
Document Title
Paradise Irrigation District Water System Recovery and Reservoir B Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/27/2021
Document Description
Repair and replace critical potable water and distribution system infrastructure that was damaged by the Camp Fire in 2018, including replacement of Reservoir B with two 1.5 million-gallon, bolted steel tanks.
Contact Information
Name
Tom Lando
Agency Name
Paradise Irrigation District
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project
Phone
Location
Coordinates
Cities
Paradise
Counties
Butte
Regions
Citywide, Countywide
Cross Streets
Skyway Road/Towhee Lane
Zip
95969
Total Acres
5.9
Parcel #
050-070-075, -077, and -083
Schools
Children's Community School
Waterways
West Branch Feather River
Township
22 N
Range
3 E
Section
1, 12
Base
MDBM
Other Location Info
The project would be in PID’s service area in the town of Paradise, Butte County, California. The water system recovery elements would be constructed throughout Paradise, while the Reservoir B replacement element would be located at PID’s existing facility between Skyway Road and Paradise Memorial Trail in Paradise. Paradise is located approximately 12 road miles northeast of Highway 99 and the city of Chico in Butte County, California.
Other Information
Prior to the Camp Fire, the 5.9-acre Reservoir B replacement project area included an earthen embankment covered reservoir (Reservoir B), distribution infrastructure, and adjacent areas. The land in the project area is largely disturbed with small areas of semi-natural habitat located near the existing reservoir. It is located on private and PID-owned parcels.
Notice of Determination
Approving Agency
Paradise Irrigation District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Butte
Final Environmental Document Available at
Paradise Irrigation District
6332 Clark Road
Paradise, CA
95969
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.