San Jose Data Center

3 Documents in Project

Summary

SCH Number
2021020002
Lead Agency
California Energy Commission
Document Title
San Jose Data Center
Document Type
EIR - Draft EIR
Received
Present Land Use
vacant
Document Description
The San Jose Data Center SJDC or project) includes natural gas-fired generators (to provide emergency backup power) that would constitute a thermal powerplant with a generating capacity in excess of 50 megawatts (MW). The generating capacity of the backup generators would not exceed 100 MW. The California Energy Commission (CEC) has the exclusive authority to certify all thermal power plants (50 megawatts [MW] and greater) and related facilities proposed for construction in California. The Small Power Plant Exemption (SPPE) process allows applicants with facilities between 50 and 100 MW to obtain an exemption from CEC’s jurisdiction and proceed with local permitting rather than requiring CEC certification. CEC can grant an exemption if it finds that the proposed facility would not create a substantial adverse impact on the environment or energy resources. Public Resources Code section 25519(c) designates CEC as the lead agency, in accordance with the California Environmental Quality Act (CEQA), for all facilities seeking an SPPE. Microsoft Corporation (Microsoft or applicant) is seeking a Small Power Plant Exemption (SPPE) from the California Energy Commission’s (CEC) jurisdiction to proceed with local approval rather than requiring certification by the CEC for the San Jose Data Center (SJDC or project). The applicant proposes to construct and operate the project, located at 1657 Alviso-Milpitas Road in San Jose, California. The project would consist of two single-story data center buildings. To provide reliable operation of the project in the event of loss of electrical service from the local electric utility provider, Pacific Gas and Electric Company (PG&E), the project includes 224 renewable natural gas1 (natural gas) generators each rated at 0.45 megawatt (MW) output capacity to provide electrical power to support the data center uses during utility outages, certain onsite electrical equipment interruptions or failure, and for load shedding, demand response and behind-the-meter resource adequacy ancillary services. The maximum electrical load of the project would be 99 MW, although the estimated load is 77 MW, inclusive of information technology (IT) equipment, ancillary electrical/ telecommunications equipment, and other electrical loads (administrative, heat rejection, and safety/ security). In addition, the project includes two Tier 4 diesel-powered generators (designated as administrative generators), with a 1.25 MW standby generator for the northern building and a 0.5 MW standby generator for the southern building. The project also includes an onsite 115 kilovolt (kV) substation located in the northwestern corner of the project site with two 115 kV underground electrical supply lines (approximately 0.2 mile) that would connect to PG&E’s Los Esteros Substation, located adjacent to the site. The project would require offsite linears for potable water, reclaimed water, stormwater, sanitary sewer, natural gas, and electrical. Natural gas is also proposed for comfort heating of the data center buildings.

Contact Information

Name
Lisa Worrall
Agency Name
California Energy Commission
Job Title
Senior Environmental Planner
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Regions
Citywide
Cross Streets
Alviso-Milpitas Rd/Ranch Rd/Mc Carthy Blvd
Zip
95119
Total Acres
64.5
Jobs
100
Parcel #
015-31-054
State Highways
SR-237, I-880
Railways
VTA, UP
Airports
none
Schools
Anthony Spangler Elementary Don Callejon Pearl Zanker Elementary
Waterways
Berryessa Creek Calera Creek Coyote Creek Guadalupe River Los Coches Creek Lower Penitencia Cree

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Coastal Commission (CCC), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Department of Water Resources (DWR), California Energy Commission, California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Office of Historic Preservation, San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality
Development Types
Other (Data center with natural gas backup generators)
Local Actions
Use Permit
Project Issues
Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Noise, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire, Soil

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print