Kudu Solar Farm by 69SV 8ME LLC
Summary
- SCH Number
- 2020099017
- Lead Agency
- Kern County
- Document Title
- Kudu Solar Farm by 69SV 8ME LLC
- Document Type
- NOP - Notice of Preparation
- Received
- Present Land Use
- Undeveloped Land/Kern County General Plan: 5.6 (Min. 2.5 Gross Acres/Unit (Fremont Interim Rural Community Plan), 8.5 (8.5 - Resource Management, Min. 20 Acre Parcel Size). Kern County Zoning: A (Exclusive Agriculture); A-1 (Limited Agriculture); A-1 MH (Limited Agriculture, Mobile Home Combining); PL RS (Platted Lands, Residential Suburban Combining); PL RS MH (Platted Lands, Residential Suburban Combining, Mobile Home Combining). California City General Plan: O/RA - Controlled Development, Public Parks & Recreation or Public Schools. California City Zoning: RA (Residential/Agriculture).
- Document Description
- The Kudu Solar Farm Project by 69SV 8ME LLC (project proponent), is a proposed photovoltaic solar facility and energy storage system capable of producing up to 500 MW of alternating current power and 600 MW hours of storage capacity on approximately 1,955.13 acres of privately-owned land. The proposed project would be supported by a 230-kV gen-tie overhead and/or underground generation tie-line (gen-tie) from originating from the Eland substation and terminating at the Los Angeles Department of Water and Power’s Barren Ridge Substation located approximately two miles to the northwest of the project site, or through an upgraded connection through Eland 1. The proposed project intends to share the Eland 1 Solar Project’s gen-tie line and right of way, which will be accomplished by constructing the line conductor capable of supporting both projects. Construction of the gen-tie and substation will be done as part of the Eland 1 Solar Project, consistent with the conditions of approval outlined in that project’s CUP(s). If the proposed project cannot share these facilities, a new gen-tie line would be developed within one of the routes previously analyzed in the Eland 1 Solar Supplemental Environmental Impact Report (State Clearinghouse No. 2012011029). The proposed project’s permanent facilities would include solar arrays and inverters, service roads, a power collection system, communication cables, overhead and underground electrical switchyards, project substations, energy storage system(s), and operations and maintenance (O&M) facilities. Implementation of the project as proposed would require: Kern County: a) ZCC 14, Map #152; b) CUP 28, Map #152; and c) GPA 10, Map #152. California City: a) CUP 19-04
- Contact Information
-
Ronelle Candia
Kern County Planning and Natural Resources Department
2700 "M" Street Suite 100
Bakersfield, CA 93101
Phone : (661) 862-8997
Location
- Coordinates
- 35°10'41.39"N 118°0'37.92"W
- Cities
- California City
- Counties
- Kern
- Cross Streets
- bisected E/W by Washburn Blvd. and N/S by Neuralia Road; 1-mile west of State Route 14
- Total Acres
- 2,672.53
- Parcel #
- Multiple
- State Highways
- SR 14
- Railways
- Union Pacific
- Airports
- California City Airport
- Waterways
- Cache Creek
- Range
- 37E
- Section
- SBB&M
- Other Location Info
- Townsjip: 31S, 32S Section: Multiple
Notice of Completion
- Review Period Start
- Review Period End
- Development Type
- Power (Solar PV)(500 Watts)
- Local Action
- General Plan Amendment Rezone Use Permit
- Project Issues
- Aesthetic/Visual Agricultural Land Air Quality Archaeologic-Historic Biological Resources Drainage/Absorption Economics/Jobs Flood Plain/Flooding Forest Land/Fire Hazard Geologic/Seismic Greenhouse Gas Emissions Minerals Noise Population/Housing Balance Public Services Recreation/Parks Schools/Universities Septic System Sewer Capacity Soil Erosion/Compaction/Grading Solid Waste Toxic/Hazardous Traffic/Circulation Tribal Cultural Resources Vegetation Water Quality Water Supply Wetland/Riparian Wildlife Growth Inducing Land Use Cumulative Effects Energy
- Reviewing Agencies
- California Air Resources Board California Department of Forestry and Fire Protection California Department of Parks and Recreation California Department of Resources Recycling and Recovery California Department of Transportation, Division of Aeronautics California Department of Water Resources California Energy Commission California Governor's Office of Emergency Services California Highway Patrol California Natural Resources Agency California Public Utilities Commission California Regional Water Quality Control Board, Central Valley Sacramento Region 5 California State Lands Commission Central Valley Flood Protection Board Department of Food and Agriculture Department of Toxic Substances Control Office of Historic Preservation State Water Resources Control Board, Division of Water Quality California Native American Heritage Commission California Department of Conservation California Department of Transportation, District 9 California Department of Fish and Wildlife, Central Region 4
Attachments
- Environmental Document
- Kudu Solar_Initial Study and NOP_September 2020 PDF 11446 K Kudu Solar_Notice of Preparation PDF 2775 K Kudu Solar_Summary_Form_for_Document_Submittal PDF 592 K
- NOC
- Kudu Solar_Notice of Completion PDF 267 K
- State Comments
- 2020099017_Caltrans Comment PDF 133 K 2020099017_CDFW Comment PDF 334 K 2020099017_Conservation Comment PDF 336 K 2020099017_NAHC Comment PDF 279 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.