Sandra Hayne Storm Drain Replacement & Creek Daylighting Project
2 Documents in Project
Summary
SCH Number
2020089023
Lead Agency
City of Hillsborough
Document Title
Sandra Hayne Storm Drain Replacement & Creek Daylighting Project
Document Type
NOD - Notice of Determination
Received
Posted
4/14/2021
Document Description
The storm drain replacement portion of the Proposed Project would involve removing the existing 36-inch corrugated metal pipe (CMP) and reinforced concrete pipe (RCP) that runs parallel to Hayne Road and abandoning a portion of 36-inch RCP in place in the Cherry Creek storm drain system. The Proposed Project also includes the demolition of a storm drain inlet and removal of the two associated 24-inch RCP tributary twin storm drains that run along the southeastern edge of the Project Site and transport storm water across Hayne Road. An 18-inch storm drain whose inlet is located on Sandra Road and a 24-inch storm drain whose inlet is on the eastern side of Hayne Road would also be removed. In addition to replacing the failing storm drains, the Proposed Project would restore a section of Cherry Creek to a more natural state.
Contact Information
Name
Natalie Gribben
Agency Name
Town of Hillsborough
Contact Types
Lead/Public Agency
Phone
Location
Cities
Hillsborough
Counties
San Mateo
Regions
Citywide, Countywide, Northern California, San Francisco Bay Area
Cross Streets
85 Sandra Road, 1465 San Raymundo, and a private parcel on Hayne Road with no site
Zip
94010
Total Acres
0.62
Parcel #
030-272-010 and 030-273-010
State Highways
I-280
Schools
West Hillsborough Elementary
Notice of Determination
Approving Agency
Town of Hillsborough
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
www.hillsborough.net
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.