SCH Number 2020089023
Project Info
- Title
- Sandra Hayne Storm Drain Replacement & Creek Daylighting Project
- Description
- The storm drain replacement portion of the Proposed Project would involve removing the existing 36-inch corrugated metal pipe (CMP) and reinforced concrete pipe (RCP) that runs parallel to Hayne Road and abandoning a portion of 36-inch RCP in place in the Cherry Creek storm drain system. The Proposed Project also includes the demolition of a storm drain inlet and removal of the two associated 24-inch RCP tributary twin storm drains that run along the southeastern edge of the Project Site and transport storm water across Hayne Road. An 18-inch storm drain whose inlet is located on Sandra Road and a 24-inch storm drain whose inlet is on the eastern side of Hayne Road would also be removed. In addition to replacing the failing storm drains, the Proposed Project would restore a section of Cherry Creek to a more natural state.
2 documents in project